Close Menu
reNEWSreNEWS
  • Home
  • Offshore Wind
  • Onshore Wind
  • Solar
  • Other News
    • Energy Storage
    • Finance
    • Grid
    • People
    • reMIX
  • More
    • Company Profiles
    • Events
    • National Wind Energy Awards 2026
Latest News

ILOS Energy banks €143m to build Irish solar site

Zelestra wins 60MW in Italy FER X

Q ENERGY powers up Cahuzac solar park

LinkedIn Facebook X (Twitter)
LinkedIn Facebook X (Twitter)
  • Email Briefings
  • About
  • Advertise
  • Contact
reNEWSreNEWS
  • Home
  • Offshore Wind

    Azerbaijan signs offshore wind deal

    December 6, 2025

    LSP Renewables lands Fengmiao contract

    December 2, 2025

    CIP wins permit for 480MW Morecambe

    December 1, 2025

    AD Ports and Masdar sign offshore pact

    December 1, 2025

    Ocean Winds hits €2bn BC-Wind financial close

    December 1, 2025
  • Onshore Wind

    McDonald’s UK inks 66MW Scottish wind PPA

    December 2, 2025

    OX2 buys 235MW Romanian wind trio

    December 2, 2025

    Vestas expands Polish blade factory

    December 2, 2025

    Infinity Power starts Ras Ghareb build

    December 1, 2025

    Fortum seals deal for 4.4GW Finnish pipeline

    November 28, 2025
  • Solar

    ILOS Energy banks €143m to build Irish solar site

    April 22, 2026

    Zelestra wins 60MW in Italy FER X

    April 22, 2026

    Q ENERGY powers up Cahuzac solar park

    April 22, 2026

    Solar and storage surge in US

    April 22, 2026

    R.Power starts 20MW Klotze solar build

    April 22, 2026
  • Other News
    • Energy Storage
    • Finance
    • Grid
    • People
    • reMIX
  • More
    • Company Profiles
    • Events
    • National Wind Energy Awards 2026
LinkedIn Facebook X (Twitter)
reNEWSreNEWS
Home » Offshore Wind » Haliade due for Catapult trial
Offshore Wind

Haliade due for Catapult trial

adminBy adminJune 1, 20182 Mins Read
Tests at Blyth facility to inform build of GE's 12MW machine

A GE Haliade 6MW nacelle is due to arrive for testing at the Offshore Renewable Energy (ORE) Catapult’s Blyth-based testing facility in north-east England.

The test of the 6MW unit, which will arrive today, will last 12 months and inform the development of a prototype nacelle for GE’s next generation 12MW machine.

GE offshore wind business chief executive and president John Lavelle said: “Our Haliade 150-6MW will be tested under rough and extreme conditions in a short period of time, allowing us to collect data to be used on our recently announced Haliade-X 12MW offshore wind turbine.

“We will utilise the data and learnings to maximise availability and power output, while introducing new features to meet customers’ demands.”

A 12MW Haliade-X nacelle will arrive at the Catapult next year for accelerated indoor testing.

GE is poised to deploy a full outdoor prototype at an as-yet-unknown test site in Europe, also in 2019.

ORE Catapult test and validation director Tony Quinn said: “GE’s Haliade programmes will be the first to use the Catapult’s 15MW drive train test facility, and the investment in this technology is paramount to bringing such world-leading research and development programmes to the UK.” 

Image:  ORE Catapult’s 15MW drive train test facility (ORE Catapult)



England Europe GE offshore wind ORE Catapult UK
Share. Facebook LinkedIn Bluesky Twitter Reddit Email Copy Link
Previous ArticleWelsh wave readies Cornwall test
Next Article NextEnergy scores UK PV double

Related News

Floater lab connects to BIMEP grid

November 27, 2025

Nordex opens converter test bench in Rostock

November 26, 2025

UK offshore maps innovation path

May 31, 2018
Advertisement

Latest News

ILOS Energy banks €143m to build Irish solar site

April 22, 2026

Zelestra wins 60MW in Italy FER X

April 22, 2026

Q ENERGY powers up Cahuzac solar park

April 22, 2026

Solar and storage surge in US

April 22, 2026
Advertisement

Advertisement

Company Profiles
  • Collett & Sons Ltd
  • TGS
  • Seaway7
    Seaway7
  • Pembroke Port
  • Ørsted
  • LSP
    LSP Renewables
  • Full Circle Wind Services
  • EEW
    EEW Special Pipe Constructions GmbH
  • EDF
    EDF
  • Brightwind
    BrightWind Limited
reNEWS
LinkedIn Facebook X (Twitter)
reMIX | Company Profiles | Industry Events
Get in touch | Advertising with us | About reNEWS

© 2026 Lewis Business Media. All Rights Reserved.
Lewis Business Media, Suite A, Arun House, Office Village, River Way, Uckfield, TN22 1SL

Terms and Conditions | Privacy Policy | Cookie Policy

Type above and press Enter to search. Press Esc to cancel.

Manage Consent
To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behaviour or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.
Functional Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
  • Manage options
  • Manage services
  • Manage {vendor_count} vendors
  • Read more about these purposes
View preferences
  • {title}
  • {title}
  • {title}