Nordex Group is to supply turbines totalling 101.4MW to independent power producer Genneia for the Pomona wind farm in Argentina.
The German manufacturer said it will deliver and install 26 N131/3900 turbines on 120-metre towers on a full engineering, procurement and construction basis.
Preparations for construction will start this year, with installation at the beginning of 2019.
The deal also includes a 10-year operations and maintenance contract.
The wind farm will be installed in Pomona in Rio Negro, where average wind speeds of 8.6 metres a second have been measured, Nordex said.
Image: Nordex


