Close Menu
reNEWSreNEWS
  • Home
  • Offshore Wind
  • Onshore Wind
  • Solar
  • Other News
    • Energy Storage
    • Finance
    • Grid
    • People
    • reMIX
  • More
    • Company Profiles
    • Events
    • National Wind Energy Awards 2026
Latest News

PODCAST: Is UK offshore wind back on track?

All-Energy 2026: Shanks bullish on UK clean power

GWEC, TÜREB launch wind partnership

LinkedIn Facebook X (Twitter)
LinkedIn Facebook X (Twitter)
  • Email Briefings
  • About
  • Advertise
  • Contact
reNEWSreNEWS
  • Home
  • Offshore Wind

    PODCAST: Is UK offshore wind back on track?

    May 13, 2026

    UK offshore wind pipeline reaches 93GW

    May 13, 2026

    Seaway7 completes Hai Long cable works

    May 13, 2026

    DEME names new jack-up vessel

    May 13, 2026

    Mubadala invests $325m into Hornsea 3

    May 13, 2026
  • Onshore Wind

    ENERCON to build Türkiye blade plant

    May 13, 2026

    ‘Fatality at South Korean wind farm’

    May 13, 2026

    Scottish onshore wind forum launches

    May 12, 2026

    ENOVA starts 30MW Hiddels repowering

    May 12, 2026

    Iberdrola buys 40MW Italian wind farm

    May 12, 2026
  • Solar

    VSB secures Sicily PV project approval

    May 13, 2026

    Matrix connects two Spanish renewable projects

    May 13, 2026

    Qualitas targets €10bn energy investments

    May 12, 2026

    Consultation opens for 49.9MW Barrons Solar

    May 12, 2026

    Great North Road solar nears decision

    May 11, 2026
  • Other News
    • Energy Storage
    • Finance
    • Grid
    • People
    • reMIX
  • More
    • Company Profiles
    • Events
    • National Wind Energy Awards 2026
LinkedIn Facebook X (Twitter)
reNEWSreNEWS
Home » Uncategorized » Vineyard, GE layout plan to resume installation
Offshore Wind

Vineyard, GE layout plan to resume installation

Michael Lee-MurphyBy Michael Lee-MurphyAugust 12, 20242 Mins Read
Vineyard

Avangrid and CIP’s 804MW Vineyard Wind and GE Vernova have put in place a three-step inspection process that will allow the company to resume turbine installation after confirming that a manufacturing defect was behind a July blade failure at the array off the coast of Massachusetts. 

The plan, according to Vineyard Wind, will begin with the processing of over 8,300 ultrasound testing records, to determine whether bond requirements are satisfied. Any issues identified will be further inspected and corrective action taken as necessary, Vineyard Wind said. 

Advertisement

Second, the developer will use advanced remote-controlled wheeled drones called “crawlers” inserted into the blades. The crawlers will use cameras to feed photos and videos to technicians who will examine the blades for anomalies. 

GE Vernova will also be deploying a new algorithm using sensors in the blade to monitor blade health.

“We believe we have the right plan in place to recover the rest of the blade, secure any debris offshore and onshore, and safely and responsibly resume the installation program so we can put this project back on track to deliver needed clean power to the New England region,”  Vineyard Wind CEO Klaus S. Møller said. 

The plan was developed in compliance with the Bureau of Safety and Environmental Enforcement’s superseding order, as well s the U.S. Coast Guard.  

In addition to the testing regime Vineyard Wind is working with contractor Resolve Marine to remove the rest of the damaged blade. The process involves four steps: rotating the blade to reduce hanging blade and possible controlled cutting; removing the root of the blade from the hub; removing fallen debris from the platform; and addressing seabed debris.

The review of ultrasound photos and the use of crawlers to inspect existing blades has already begun, Vineyard Wind said. 

The company said it is working with Federal, Tribal, state, and local stakeholders to restart construction. 

Avangrid blade failure CIP GE Vernova Vineyard Wind
Share. Facebook LinkedIn Bluesky Twitter Reddit Email Copy Link
Previous ArticleVestas trims outlook over service costs spike
Next Article New solar, storage JV plans 25 UK sites

Related News

UPDATED: Vineyard Wind turbine struck by lightning

March 4, 2025

Vineyard Wind to remove Canada-made GE blades

January 20, 2025

Vineyard Wind mobilises debris recovery

July 16, 2024
Advertisement

Latest News

PODCAST: Is UK offshore wind back on track?

May 13, 2026

All-Energy 2026: Shanks bullish on UK clean power

May 13, 2026

GWEC, TÜREB launch wind partnership

May 13, 2026

ENERCON to build Türkiye blade plant

May 13, 2026
Advertisement

Advertisement

Company Profiles
  • Collett & Sons Ltd
  • TGS
  • Seaway7
    Seaway7
  • Pembroke Port
  • Ørsted
  • Navantia Seanergies
    Navantia Seanergies
  • LSP
    LSP Renewables
  • Full Circle Wind Services
  • EDF
    EDF
  • Bilfinger UK
reNEWS
LinkedIn Facebook X (Twitter)
reMIX | Company Profiles | Industry Events
Get in touch | Advertising with us | About reNEWS

© 2026 Lewis Business Media. All Rights Reserved.
Lewis Business Media, Suite A, Arun House, Office Village, River Way, Uckfield, TN22 1SL

Terms and Conditions | Privacy Policy | Cookie Policy

Type above and press Enter to search. Press Esc to cancel.

Manage Consent
To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behaviour or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.
Functional Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
  • Manage options
  • Manage services
  • Manage {vendor_count} vendors
  • Read more about these purposes
View preferences
  • {title}
  • {title}
  • {title}