Close Menu
reNEWSreNEWS
  • Home
  • Offshore Wind
  • Onshore Wind
  • Solar
  • Other News
    • Energy Storage
    • Finance
    • Grid
    • People
    • reMIX
  • More
    • Company Profiles
    • Events
    • National Wind Energy Awards 2026
Latest News

PODCAST: Is UK offshore wind back on track?

All-Energy 2026: Shanks bullish on UK clean power

GWEC, TÜREB launch wind partnership

LinkedIn Facebook X (Twitter)
LinkedIn Facebook X (Twitter)
  • Email Briefings
  • About
  • Advertise
  • Contact
reNEWSreNEWS
  • Home
  • Offshore Wind

    PODCAST: Is UK offshore wind back on track?

    May 13, 2026

    UK offshore wind pipeline reaches 93GW

    May 13, 2026

    Seaway7 completes Hai Long cable works

    May 13, 2026

    DEME names new jack-up vessel

    May 13, 2026

    Mubadala invests $325m into Hornsea 3

    May 13, 2026
  • Onshore Wind

    ENERCON to build Türkiye blade plant

    May 13, 2026

    ‘Fatality at South Korean wind farm’

    May 13, 2026

    Scottish onshore wind forum launches

    May 12, 2026

    ENOVA starts 30MW Hiddels repowering

    May 12, 2026

    Iberdrola buys 40MW Italian wind farm

    May 12, 2026
  • Solar

    VSB secures Sicily PV project approval

    May 13, 2026

    Matrix connects two Spanish renewable projects

    May 13, 2026

    Qualitas targets €10bn energy investments

    May 12, 2026

    Consultation opens for 49.9MW Barrons Solar

    May 12, 2026

    Great North Road solar nears decision

    May 11, 2026
  • Other News
    • Energy Storage
    • Finance
    • Grid
    • People
    • reMIX
  • More
    • Company Profiles
    • Events
    • National Wind Energy Awards 2026
LinkedIn Facebook X (Twitter)
reNEWSreNEWS
Home » Uncategorized » First turbine sets sail for Vineyard Wind project site
Offshore Wind

First turbine sets sail for Vineyard Wind project site

SaraBy SaraSeptember 7, 20232 Mins Read
First turbine sets sail for Vineyard Wind project site

The first turbine for the 800MW Vineyard Wind offshore wind farm, off the coast of Massachusetts, US, has departed from the New Bedford Marine Commerce Terminal to its location at sea.

Foss Maritime, a US service contractor that provides union jobs for its employees, has partnered with DEME Offshore US to design and build specialised US-flagged barges to transport the GE Haliade-X turbines and blades to the lease area. 

Advertisement

The Marmac in New Bedford and the Foss Prevailing Wind in Boston are the only two barges capable of transporting in an upright position GE’s Haliade-X turbine components that when constructed will rise more than 700 feet.

The barges use a specially designed Barge Master technology that uses a patented control system and cylinders that support a platform and actively compensate the motions of the barge.

The wind turbine components are fastened to the motion compensated platform for a smooth ride in ocean conditions.

“It may look easy, but the safe transportation of these components miles over the open water is no small feat,” said Vineyard Wind CEO Klaus Moeller. 

“While we’ve had many firsts, once this turbine is installed, it will stand as a proud symbol of American’s energy transition. 

“I want to thank all of our partners for their continued collaboration and look forward to celebrating the progress of our industry.”

GE will initially load the US-flagged Marmac from the New Bedford Marine Commerce Terminal with three vertically placed tower sections reaching more than 200 feet in height, three 321-foot-long blades and a nacelle pod that houses the generating components.

Foss will deliver loads weighing more than 1700 tons each, to construction partner DEME Group’s Sea Installer vessel with 300-foot-deep legs stationed 65 miles from New Bedford south of Martha’s Vineyard.

“DEME is proud to partner with Foss Maritime to play a critical role in deploying Vineyard’s offshore wind turbine components on specialised US-flagged barges from New Bedford to the project site offshore,” said DEME Offshore US President Bill White. 

Sea Installer is a heavy lift jack up crane vessel that lifts itself out of the water on legs that are over 300 feet in length. 

Once elevated, the vessel becomes a platform where the recently upgraded crane, now capable of lifting more than 1600 tons, can install the tower sections, nacelle and blades for each turbine.

DEME Offshore GE Haliade-X Offshore Wind Vineyard Wind
Share. Facebook LinkedIn Bluesky Twitter Reddit Email Copy Link
Previous ArticleRWE, SSE Renewables revise North Falls
Next Article FuturEnergy, Greencoat Renewables ink Irish wind deal

Related News

DEME, Barge Master strike US feeder solution deal

May 4, 2022

DEME Offshore wins Vineyard turbine installation job

February 23, 2022

Vineyard and Mayflower Wind agree staging port leases

August 21, 2020
Advertisement

Latest News

PODCAST: Is UK offshore wind back on track?

May 13, 2026

All-Energy 2026: Shanks bullish on UK clean power

May 13, 2026

GWEC, TÜREB launch wind partnership

May 13, 2026

ENERCON to build Türkiye blade plant

May 13, 2026
Advertisement

Advertisement

Company Profiles
  • Collett & Sons Ltd
  • TGS
  • Qualsurv Marine Consulting
    Qualsurv Marine Consulting
  • Pembroke Port
  • Ørsted
  • Oceantic Network
  • Navantia Seanergies
    Navantia Seanergies
  • JDR Cable Systems Ltd
  • EDF
    EDF
  • Brightwind
    BrightWind Limited
reNEWS
LinkedIn Facebook X (Twitter)
reMIX | Company Profiles | Industry Events
Get in touch | Advertising with us | About reNEWS

© 2026 Lewis Business Media. All Rights Reserved.
Lewis Business Media, Suite A, Arun House, Office Village, River Way, Uckfield, TN22 1SL

Terms and Conditions | Privacy Policy | Cookie Policy

Type above and press Enter to search. Press Esc to cancel.

Manage Consent
To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behaviour or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.
Functional Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
  • Manage options
  • Manage services
  • Manage {vendor_count} vendors
  • Read more about these purposes
View preferences
  • {title}
  • {title}
  • {title}