Close Menu
reNEWSreNEWS
  • Home
  • Offshore Wind
  • Onshore Wind
  • Solar
  • Other News
    • Energy Storage
    • Finance
    • Grid
    • People
    • reMIX
  • More
    • Company Profiles
    • Events
    • National Wind Energy Awards 2026
Latest News

PODCAST: Is UK offshore wind back on track?

All-Energy 2026: Shanks bullish on UK clean power

GWEC, TÜREB launch wind partnership

LinkedIn Facebook X (Twitter)
LinkedIn Facebook X (Twitter)
  • Email Briefings
  • About
  • Advertise
  • Contact
reNEWSreNEWS
  • Home
  • Offshore Wind

    PODCAST: Is UK offshore wind back on track?

    May 13, 2026

    UK offshore wind pipeline reaches 93GW

    May 13, 2026

    Seaway7 completes Hai Long cable works

    May 13, 2026

    DEME names new jack-up vessel

    May 13, 2026

    Mubadala invests $325m into Hornsea 3

    May 13, 2026
  • Onshore Wind

    ENERCON to build Türkiye blade plant

    May 13, 2026

    ‘Fatality at South Korean wind farm’

    May 13, 2026

    Scottish onshore wind forum launches

    May 12, 2026

    ENOVA starts 30MW Hiddels repowering

    May 12, 2026

    Iberdrola buys 40MW Italian wind farm

    May 12, 2026
  • Solar

    VSB secures Sicily PV project approval

    May 13, 2026

    Matrix connects two Spanish renewable projects

    May 13, 2026

    Qualitas targets €10bn energy investments

    May 12, 2026

    Consultation opens for 49.9MW Barrons Solar

    May 12, 2026

    Great North Road solar nears decision

    May 11, 2026
  • Other News
    • Energy Storage
    • Finance
    • Grid
    • People
    • reMIX
  • More
    • Company Profiles
    • Events
    • National Wind Energy Awards 2026
LinkedIn Facebook X (Twitter)
reNEWSreNEWS
Home » Uncategorized » Work starts on first US mini CTV
Offshore Wind

Work starts on first US mini CTV

Eleanore RobinsonBy Eleanore RobinsonAugust 7, 20233 Mins Read
Work starts on first US mini CTV

US offshore vessel operator Edison Chouest Offshore (ECO) has started construction of the US offshore wind industry’s first-ever mini-crew transfer vessel (CTV), designed by Chartwell Marine.

Set to begin operating in summer 2024 for Orsted and Eversource Energy, the CTV will simultaneously accompany the launch of ECO Edison, the first-ever American-built service operation vessel (SOV) announced in April this year.

Advertisement

This daughter craft onboard the SOV can be deployed to efficiently manoeuvre crew across the Revolution Wind, South Fork Wind, and Sunrise Wind offshore wind farms in the Northeast US, under development by Orsted and Eversource JV. 

Building commenced in July 2023 at Edison Chouest’s Louisiana shipyard, drawing components from US suppliers, and using Chartwell’s design from its expanded range of offshore wind support catamarans – which has seen orders from across Europe, Asia, and the USA.

ECO will manage the entire pipeline of construction and operation, supported by the incentives provided by the Inflation Reduction Act.

Chartwell’s design responds to the increasing demand in the US offshore wind market for low-emissions, cost-effective support vessels, with the catamaran’s optimised hull form offering efficient fuel use as well as stability and manoeuvrability in choppy waters.

The Volvo Penta IPS (integrated propulsion system) provides high power and performance as well as onboard comfort for operators, ECO said.

The system allows for a wide number of optional features and functions, featuring forward-facing, twin counter-rotating propellers with an individually steerable IPS under the hull, it added. 

The 12-metre mini-CTV has a capacity of up to 12 personnel and is designed to be deployed from ECO Edison during extended offshore stays, offering key staff comfortable and efficient access to turbines, vessels, and other critical project infrastructure.

Working closely with Orsted throughout the design process, Chartwell conducted model testing in January 2023 to simulate and adapt to the specifications of the wind turbines that will be installed at the north-east US project sites.

Considerations were made to facilitate Orsted’s Get Up Safe system, which is a motion-compensated hoist solution that enables technicians to safely transfer between small moving vessels and offshore wind turbines without a ladder.

Chartwell managing director Andy Page said: “This vessel is the small but essential chain connecting SOVs and turbines together. Engineers need to safely transition from larger vessels to turbines quickly and safely, and we set out to design an agile and streamlined vessel that has both bases covered.

“But it’s not a one-size-fits-all – turbines come in different configurations, with different requirements for effective crew transfer.

“That’s why we collaborated with Orsted to thoroughly test and tweak our design to the joint venture portfolio’s particular needs.

“We’re grateful for their collaboration and honoured to have our design be the first out on US waters servicing the renewables industry, and with Edison Chouest at the helm, no less.”

Vice president of renewables at ECO Michael Braid added: “ECO Edison needed to have the perfect partner on launch, and Chartwell has crafted her. As we look to further expand our fleet and activate it across a growing number of offshore wind projects, maintaining the efficiency of our transfers and our high level of technical availability will be key.

“Diversifying the range of vessels we use is one of the ways we can achieve that, but making sure they’re best-in-class is equally important.”

Chartwell Marine Edison Chouest Eversource Energy Offshore Wind Orsted USA
Share. Facebook LinkedIn Bluesky Twitter Reddit Email Copy Link
Previous ArticleRenewableUK poll finds support for new UK grid
Next Article GE Vernova, ORE Catapult to create new programme

Related News

Work starts on new Chartwell CTV

April 17, 2024

Work starts on first Jones Act compliant SOV

March 4, 2022

Orsted inks Jones Act-compliant SOV deal

October 1, 2020
Advertisement

Latest News

PODCAST: Is UK offshore wind back on track?

May 13, 2026

All-Energy 2026: Shanks bullish on UK clean power

May 13, 2026

GWEC, TÜREB launch wind partnership

May 13, 2026

ENERCON to build Türkiye blade plant

May 13, 2026
Advertisement

Advertisement

Company Profiles
  • Leask Marine
  • TGS
  • Pembroke Port
  • Oceantic Network
  • LSP
    LSP Renewables
  • JDR Cable Systems Ltd
  • EEW
    EEW Special Pipe Constructions GmbH
  • EDF
    EDF
  • Brightwind
    BrightWind Limited
  • Bilfinger UK
reNEWS
LinkedIn Facebook X (Twitter)
reMIX | Company Profiles | Industry Events
Get in touch | Advertising with us | About reNEWS

© 2026 Lewis Business Media. All Rights Reserved.
Lewis Business Media, Suite A, Arun House, Office Village, River Way, Uckfield, TN22 1SL

Terms and Conditions | Privacy Policy | Cookie Policy

Type above and press Enter to search. Press Esc to cancel.

Manage Consent
To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behaviour or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.
Functional Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
  • Manage options
  • Manage services
  • Manage {vendor_count} vendors
  • Read more about these purposes
View preferences
  • {title}
  • {title}
  • {title}