Close Menu
reNEWSreNEWS
  • Home
  • Offshore Wind
  • Onshore Wind
  • Solar
  • Other News
    • Energy Storage
    • Finance
    • Grid
    • People
    • reMIX
  • More
    • Company Profiles
    • Events
    • National Wind Energy Awards 2026
Latest News

PODCAST: Is UK offshore wind back on track?

All-Energy 2026: Shanks bullish on UK clean power

GWEC, TÜREB launch wind partnership

LinkedIn Facebook X (Twitter)
LinkedIn Facebook X (Twitter)
  • Email Briefings
  • About
  • Advertise
  • Contact
reNEWSreNEWS
  • Home
  • Offshore Wind

    PODCAST: Is UK offshore wind back on track?

    May 13, 2026

    UK offshore wind pipeline reaches 93GW

    May 13, 2026

    Seaway7 completes Hai Long cable works

    May 13, 2026

    DEME names new jack-up vessel

    May 13, 2026

    Mubadala invests $325m into Hornsea 3

    May 13, 2026
  • Onshore Wind

    ENERCON to build Türkiye blade plant

    May 13, 2026

    ‘Fatality at South Korean wind farm’

    May 13, 2026

    Scottish onshore wind forum launches

    May 12, 2026

    ENOVA starts 30MW Hiddels repowering

    May 12, 2026

    Iberdrola buys 40MW Italian wind farm

    May 12, 2026
  • Solar

    VSB secures Sicily PV project approval

    May 13, 2026

    Matrix connects two Spanish renewable projects

    May 13, 2026

    Qualitas targets €10bn energy investments

    May 12, 2026

    Consultation opens for 49.9MW Barrons Solar

    May 12, 2026

    Great North Road solar nears decision

    May 11, 2026
  • Other News
    • Energy Storage
    • Finance
    • Grid
    • People
    • reMIX
  • More
    • Company Profiles
    • Events
    • National Wind Energy Awards 2026
LinkedIn Facebook X (Twitter)
reNEWSreNEWS
Home » Uncategorized » Enercon installs new E-nacelle at Dutch wind farm
Onshore Wind

Enercon installs new E-nacelle at Dutch wind farm

reNEWS EditorialBy reNEWS EditorialSeptember 30, 20222 Mins Read
Enercon installs new E-nacelle at Dutch wind farm

Enercon has installed an innovative E-nacelle on its EP3 wind energy converter.

The first machine house was hoisted and installed on an E-138 EP3 E3 WEC at the Staphorst wind farm in the Netherlands.

Advertisement

Enercon is currently constructing three wind energy converters of this kind at the wind farm.

Already introduced on the company’s EP5 platform, the electrical systems for the E-nacelle are fully integrated in the machine house. A separate E-module in the tower base is dispensed with, resulting in substantial benefits in terms of costs and time expenditure for production, transport and logistics, and during installation and commissioning.

The component is completed and tested at the factory before being transported to the installation site plug-and-play ready.

On top of this, the approximately 72-tonne EP3 E-nacelle contains latest-generation power electronics: new Enercon full-scale converters with higher performance that have been specially designed for use cases of onshore wind with a high share of partial load operation hours convert the energy produced.

In addition, they meet the highest requirements for connecting to electrical energy networks worldwide.

This innovative piece of electrical engineering will also be used for the new E-175 EP5 WEC type in future, which Enercon presented for the first time at the Hamburg WindEnergy trade fair.

“The EP3 E-nacelle is thus an important milestone in our technology roadmap towards a sustained reduction of the cost of energy,” said Enercon CTO Jorg Scholle.

“Step by step we are bringing new technologies and improvements for our two most important product platforms onto the market – always with the aim of offering our customers strong, reliable products perfectly tailored to meet their requirements.”

E-nacelle ENERCON machine house Netherland Onshore Wind Renewable energy news Staphorst Staphorst wind farm Wind energy wind farm wind power wind turbine
Share. Facebook LinkedIn Bluesky Twitter Reddit Email Copy Link
Previous ArticleEnbridge acquires US renewable developer TGE
Next Article Dublin awards seven offshore wind leases

Related News

Enercon launches E-138 turbine variant

January 29, 2025

Enercon debuts new nacelle with first customer

September 12, 2023

Hamburg 2022: Enercon unveils 6MW E-175 turbine

September 26, 2022
Advertisement

Latest News

PODCAST: Is UK offshore wind back on track?

May 13, 2026

All-Energy 2026: Shanks bullish on UK clean power

May 13, 2026

GWEC, TÜREB launch wind partnership

May 13, 2026

ENERCON to build Türkiye blade plant

May 13, 2026
Advertisement

Advertisement

Company Profiles
  • Leask Marine
  • TGS
  • Seaway7
    Seaway7
  • Pembroke Port
  • Oceantic Network
  • LSP
    LSP Renewables
  • JDR Cable Systems Ltd
  • Full Circle Wind Services
  • EDF
    EDF
  • Brightwind
    BrightWind Limited
reNEWS
LinkedIn Facebook X (Twitter)
reMIX | Company Profiles | Industry Events
Get in touch | Advertising with us | About reNEWS

© 2026 Lewis Business Media. All Rights Reserved.
Lewis Business Media, Suite A, Arun House, Office Village, River Way, Uckfield, TN22 1SL

Terms and Conditions | Privacy Policy | Cookie Policy

Type above and press Enter to search. Press Esc to cancel.

Manage Consent
To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behaviour or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.
Functional Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
  • Manage options
  • Manage services
  • Manage {vendor_count} vendors
  • Read more about these purposes
View preferences
  • {title}
  • {title}
  • {title}