Close Menu
reNEWSreNEWS
  • Home
  • Offshore Wind
  • Onshore Wind
  • Solar
  • Other News
    • Energy Storage
    • Finance
    • Grid
    • People
    • reMIX
  • More
    • Company Profiles
    • Events
    • National Wind Energy Awards 2026
Latest News

PODCAST: Is UK offshore wind back on track?

All-Energy 2026: Shanks bullish on UK clean power

GWEC, TÜREB launch wind partnership

LinkedIn Facebook X (Twitter)
LinkedIn Facebook X (Twitter)
  • Email Briefings
  • About
  • Advertise
  • Contact
reNEWSreNEWS
  • Home
  • Offshore Wind

    PODCAST: Is UK offshore wind back on track?

    May 13, 2026

    UK offshore wind pipeline reaches 93GW

    May 13, 2026

    Seaway7 completes Hai Long cable works

    May 13, 2026

    DEME names new jack-up vessel

    May 13, 2026

    Mubadala invests $325m into Hornsea 3

    May 13, 2026
  • Onshore Wind

    ENERCON to build Türkiye blade plant

    May 13, 2026

    ‘Fatality at South Korean wind farm’

    May 13, 2026

    Scottish onshore wind forum launches

    May 12, 2026

    ENOVA starts 30MW Hiddels repowering

    May 12, 2026

    Iberdrola buys 40MW Italian wind farm

    May 12, 2026
  • Solar

    VSB secures Sicily PV project approval

    May 13, 2026

    Matrix connects two Spanish renewable projects

    May 13, 2026

    Qualitas targets €10bn energy investments

    May 12, 2026

    Consultation opens for 49.9MW Barrons Solar

    May 12, 2026

    Great North Road solar nears decision

    May 11, 2026
  • Other News
    • Energy Storage
    • Finance
    • Grid
    • People
    • reMIX
  • More
    • Company Profiles
    • Events
    • National Wind Energy Awards 2026
LinkedIn Facebook X (Twitter)
reNEWSreNEWS
Home » Uncategorized » Anbaric completes second New Jersey offshore probe
Offshore Wind

Anbaric completes second New Jersey offshore probe

Robin LancasterBy Robin LancasterMay 10, 20212 Mins Read
Germany seeks offshore survey crews

US transmission link developer Anbaric Development Partners has completed a second set of oceanographic surveys for the Boardwalk Power Link project, which will connect offshore wind power to New Jersey’s existing onshore grid.

The survey is part of Anbaric’s efforts to develop reliable and scalable transmission projects for offshore wind in the state, the company said.

Advertisement

Anbaric said the work was carried out by ESS Group, an environmental and engineering consultancy, in concert with Ocean Surveys.

The surveys looked at geological seabed conditions for the planned subsea cable route and collector platforms located off the New Jersey coastline.

The subsurface geological investigations consisted of advancing three-metre long vibracores into the seabed along the proposed route, Anbaric said.

Seabed cores and sediment samples were collected for lab analysis of bulk chemical and bulk physical characteristics as well as thermal resistivity sampling for cable rating and design assessments, the company said.

ESS conducted benthic habitat and EFH analysis by acquiring seabed surface benthic grabs within and along the planned cable route corridor.

All geological sampling and testing protocols were conducted via Sediment Sampling Plan and have been approved by the NJDEP Office of Dredging and Sediment Technology via the Project’s Sediment Sampling and Analysis Plan.

Results of the investigations are expected to be provided to respective regulatory review agencies within the next few months, Anbaric said.

Anbaric president mid-Atlantic Janice Fuller said: “Geological seabed surveys are an important next step in our development of offshore wind projects in New Jersey.

“The data gathered through this process will ensure Boardwalk Power Link is among the most efficient and environmentally sound transmission projects in the state.”

Anbaric Grid New Jersey Offshore Wind
Share. Facebook LinkedIn Bluesky Twitter Reddit Email Copy Link
Previous ArticleOffshore wind jobs are an ‘economic driver’ in Germany
Next Article BP launches offshore wind talent drive

Related News

Anbaric submits New York grid upgrade plan

October 14, 2021

Anbaric proposes 16GW New England grid link

November 21, 2019

Anbaric calls for competition on grid links

April 10, 2019
Advertisement

Latest News

PODCAST: Is UK offshore wind back on track?

May 13, 2026

All-Energy 2026: Shanks bullish on UK clean power

May 13, 2026

GWEC, TÜREB launch wind partnership

May 13, 2026

ENERCON to build Türkiye blade plant

May 13, 2026
Advertisement

Advertisement

Company Profiles
  • Collett & Sons Ltd
  • Leask Marine
  • Seaway7
    Seaway7
  • Oceantic Network
  • Navantia Seanergies
    Navantia Seanergies
  • Natural Power
    Natural Power
  • LSP
    LSP Renewables
  • JDR Cable Systems Ltd
  • EEW
    EEW Special Pipe Constructions GmbH
  • Bilfinger UK
reNEWS
LinkedIn Facebook X (Twitter)
reMIX | Company Profiles | Industry Events
Get in touch | Advertising with us | About reNEWS

© 2026 Lewis Business Media. All Rights Reserved.
Lewis Business Media, Suite A, Arun House, Office Village, River Way, Uckfield, TN22 1SL

Terms and Conditions | Privacy Policy | Cookie Policy

Type above and press Enter to search. Press Esc to cancel.

Manage Consent
To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behaviour or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.
Functional Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
  • Manage options
  • Manage services
  • Manage {vendor_count} vendors
  • Read more about these purposes
View preferences
  • {title}
  • {title}
  • {title}