Close Menu
reNEWSreNEWS
  • Home
  • Offshore Wind
  • Onshore Wind
  • Solar
  • Other News
    • Energy Storage
    • Finance
    • Grid
    • People
    • reMIX
  • More
    • Company Profiles
    • Events
    • National Wind Energy Awards 2026
Latest News

PODCAST: Is UK offshore wind back on track?

All-Energy 2026: Shanks bullish on UK clean power

GWEC, TÜREB launch wind partnership

LinkedIn Facebook X (Twitter)
LinkedIn Facebook X (Twitter)
  • Email Briefings
  • About
  • Advertise
  • Contact
reNEWSreNEWS
  • Home
  • Offshore Wind

    PODCAST: Is UK offshore wind back on track?

    May 13, 2026

    UK offshore wind pipeline reaches 93GW

    May 13, 2026

    Seaway7 completes Hai Long cable works

    May 13, 2026

    DEME names new jack-up vessel

    May 13, 2026

    Mubadala invests $325m into Hornsea 3

    May 13, 2026
  • Onshore Wind

    ENERCON to build Türkiye blade plant

    May 13, 2026

    ‘Fatality at South Korean wind farm’

    May 13, 2026

    Scottish onshore wind forum launches

    May 12, 2026

    ENOVA starts 30MW Hiddels repowering

    May 12, 2026

    Iberdrola buys 40MW Italian wind farm

    May 12, 2026
  • Solar

    VSB secures Sicily PV project approval

    May 13, 2026

    Matrix connects two Spanish renewable projects

    May 13, 2026

    Qualitas targets €10bn energy investments

    May 12, 2026

    Consultation opens for 49.9MW Barrons Solar

    May 12, 2026

    Great North Road solar nears decision

    May 11, 2026
  • Other News
    • Energy Storage
    • Finance
    • Grid
    • People
    • reMIX
  • More
    • Company Profiles
    • Events
    • National Wind Energy Awards 2026
LinkedIn Facebook X (Twitter)
reNEWSreNEWS
Home»Other News»Wave & Tidal
Wave & Tidal

Cables laid at Cape Sharp Tidal

Tidal project in Canada hits two landmarks as Scotia Tide barge launched
EBSBy EBSDecember 10, 20152 Mins Read
Share LinkedIn Facebook Twitter Bluesky Reddit Copy Link Email
OpenHydro opts for Gemini sonars

The Cape Sharp Tidal project in Canada’s Nova Scotia has completed two significant milestones as it prepares for the next phase of its demonstration project.

The joint venture between Emera and OpenHydro has finished installing its subsea power cable and launched its deployment barge.

It was completed in a single tidal cycle, while holding position over Cape Sharp Tidal’s berth site at the Fundy Ocean Research Centre for Energy (FORCE) near Parrsboro, Nova Scotia.

Helped by marine operations partner Atlantic Towing, Cape Sharp Tidal deployed 300 metres of power and fibre-optic data cable from a specially-outfitted barge.

The existing 16MW cable was recovered and lifted and the whole system put back on the sea floor where the cables will stay until spring 2016 when the turbines are scheduled for deployment.

OpenHydro also designed the Scotia Tide barge, the largest heavy lift capacity barge in Atlantic Canada, which was deployed for the first time around the Pictou Harbour at the weekend.

It is 64 metres long, 37 metres wide, weighs 650 tonnes, has a 1,150-tonne carrying capacity and is purpose-built for deployment and recovery operations. The Scotia Tide has three heavy-lift winches that give it a unique capacity to lower and raise turbines from the sea floor.

Emera president Chris Huskilson said: “Every success of Cape Sharp Tidal manufacturing and operations is an important step toward building a tidal energy sector in Nova Scotia.

“The safe and successful cable installation and the made-in-Nova Scotia Scotia Tide barge launch are two of the more significant milestones.”

OpenHydro’s chief executive James Ives said: “Nova Scotians continue to impress with their expertise in ship-building, industrial manufacturing and as experienced marine operators.

“The barge launch and the cable installation are both Nova Scotia-made solutions that get us one step closer to a successful tidal array in this first demonstration phase of the Cape Sharp Tidal project.”

 Image: OpenHydro barge (OpenHydro)



Americas Canada Wave and Tidal

Related Stories

Emera quits Cape Sharp

August 14, 2018

Cape Sharp preps Canada tidal

February 20, 2018

Cape Sharp delivers first power

November 22, 2016
Advertisement

Latest News

PODCAST: Is UK offshore wind back on track?

May 13, 2026

All-Energy 2026: Shanks bullish on UK clean power

May 13, 2026

GWEC, TÜREB launch wind partnership

May 13, 2026

ENERCON to build Türkiye blade plant

May 13, 2026
Advertisement

Advertisement

Company Profiles
  • Leask Marine
  • TGS
  • Qualsurv Marine Consulting
    Qualsurv Marine Consulting
  • Pembroke Port
  • Ørsted
  • Oceantic Network
  • Navantia Seanergies
    Navantia Seanergies
  • Natural Power
    Natural Power
  • Full Circle Wind Services
  • Bilfinger UK
reNEWS
LinkedIn Facebook X (Twitter)
reMIX | Company Profiles | Industry Events
Get in touch | Advertising with us | About reNEWS

© 2026 Lewis Business Media. All Rights Reserved.
Lewis Business Media, Suite A, Arun House, Office Village, River Way, Uckfield, TN22 1SL

Terms and Conditions | Privacy Policy | Cookie Policy

Type above and press Enter to search. Press Esc to cancel.

Manage Consent
To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behaviour or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.
Functional Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
  • Manage options
  • Manage services
  • Manage {vendor_count} vendors
  • Read more about these purposes
View preferences
  • {title}
  • {title}
  • {title}