Turkey-based MB Holding is to build a 16.5MW geothermal plant in Croatia, the first such project in the Balkan country.
The project will be based on a single axial multi-stage Organic Rankine Cycle turbine designed by Turboden, a subsidiary of Mitsubishi Heavy Industries.
The plant will be fully operational by the end of 2016, with Turboden responsible for engineering, procurement and construction.
MB Holding chairman Muharrem Balat said: “We have selected Turboden among the possible suppliers because they will provide 10% higher revenues by means of optimized solution for our project.”
Image: a Turboden ORC unit (Turboden)


