Close Menu
reNEWSreNEWS
  • Home
  • Offshore Wind
  • Onshore Wind
  • Solar
  • Other News
    • Energy Storage
    • Finance
    • Grid
    • People
    • reMIX
  • More
    • Company Profiles
    • Events
    • National Wind Energy Awards 2026
Latest News

PODCAST: Is UK offshore wind back on track?

All-Energy 2026: Shanks bullish on UK clean power

GWEC, TÜREB launch wind partnership

LinkedIn Facebook X (Twitter)
LinkedIn Facebook X (Twitter)
  • Email Briefings
  • About
  • Advertise
  • Contact
reNEWSreNEWS
  • Home
  • Offshore Wind

    PODCAST: Is UK offshore wind back on track?

    May 13, 2026

    UK offshore wind pipeline reaches 93GW

    May 13, 2026

    Seaway7 completes Hai Long cable works

    May 13, 2026

    DEME names new jack-up vessel

    May 13, 2026

    Mubadala invests $325m into Hornsea 3

    May 13, 2026
  • Onshore Wind

    ENERCON to build Türkiye blade plant

    May 13, 2026

    ‘Fatality at South Korean wind farm’

    May 13, 2026

    Scottish onshore wind forum launches

    May 12, 2026

    ENOVA starts 30MW Hiddels repowering

    May 12, 2026

    Iberdrola buys 40MW Italian wind farm

    May 12, 2026
  • Solar

    VSB secures Sicily PV project approval

    May 13, 2026

    Matrix connects two Spanish renewable projects

    May 13, 2026

    Qualitas targets €10bn energy investments

    May 12, 2026

    Consultation opens for 49.9MW Barrons Solar

    May 12, 2026

    Great North Road solar nears decision

    May 11, 2026
  • Other News
    • Energy Storage
    • Finance
    • Grid
    • People
    • reMIX
  • More
    • Company Profiles
    • Events
    • National Wind Energy Awards 2026
LinkedIn Facebook X (Twitter)
reNEWSreNEWS
Home » Uncategorized » Pentland floater completes offshore surveys
Offshore Wind

Pentland floater completes offshore surveys

Eleanore RobinsonBy Eleanore RobinsonOctober 18, 20232 Mins Read
Pentland floater completes offshore surveys

Work to gather wind, wave and seabed data from across the 100MW Pentland Floating Offshore Wind Farm’s offshore site area and cable corridor has been completed in Scotland. 

Set to act as a blueprint to accelerate floating wind deployment, the development, which is situated 7.5km off the coast of Caithness, is anticipated to produce enough green electricity to power 70,000 homes – 65% of those in the Highland Council area.

Advertisement

The Pentland Floating Offshore Wind Farm is planned to be operational in 2026.

Detailed geophysical surveys were performed using a combination of sonar, acoustic, seismic, and magnetic techniques to give the project a detailed understanding of the geophysical properties of the site. 

The data acquired during surveys supported by Ocean Infinity, provides information such as depth to the seafloor, the type of sediment present on the surface and the layers that exist beneath. 

Wind and metocean data were also recorded using SEAWATCH® Wind Lidar Buoys, deployed by Fugro, which gathered a range of measurements, such as offshore wind speeds, to inform critical project decisions through development.  

The geotechnical survey which followed involved a combination of sampling boreholes, cone penetration tests, and in-situ testing to gather information about the lithology (physical rock characteristics) and properties of the site.

The soil and rock samples extracted with the support of Geoquip Marine, Ocean Infinity and Fugro, deepen the understanding of the site and enable a robust ground model to be developed.

This determines the engineering parameters used for detailed design and installation of the turbine foundations and submarine cables.

Richard Copeland, project director, said: “This is a significant milestone for any offshore wind development, and we are pleased to have safely and successfully completed a number of survey and monitoring campaigns over the past three years that gives us the data we need to finalise design and prepare for construction.

“We now have a best-in-class data set to help us meet the engineering challenges of this pioneering project, with two years of wind and wave data and a combination of geophysical and geotechnical surveys performed means that the project now has a high-quality 3D integrated ground model.

“We are especially grateful to our supply chain partners Ocean Infinity, Fugro and Geoquip and key local stakeholders such as Scrabster Harbour for helping us complete the work to such a high standard.”

Floating Wind Fugro Geoquip Offshore Wind Pentland Scotland
Share. Facebook LinkedIn Bluesky Twitter Reddit Email Copy Link
Previous ArticleGalileo signs its first CPPA
Next Article Asia Pacific needs speedier energy transition – Orsted

Related News

CIP lines up Stiesdal foundations for Pentland floater

October 11, 2022

Fugro kicks off surveys at 3.1GW EA Hub

July 28, 2020

Fugro Pioneer kicks off Sofia site investigations

February 20, 2020
Advertisement

Latest News

PODCAST: Is UK offshore wind back on track?

May 13, 2026

All-Energy 2026: Shanks bullish on UK clean power

May 13, 2026

GWEC, TÜREB launch wind partnership

May 13, 2026

ENERCON to build Türkiye blade plant

May 13, 2026
Advertisement

Advertisement

Company Profiles
  • TGS
  • Seaway7
    Seaway7
  • Qualsurv Marine Consulting
    Qualsurv Marine Consulting
  • Oceantic Network
  • Navantia Seanergies
    Navantia Seanergies
  • Natural Power
    Natural Power
  • LSP
    LSP Renewables
  • JDR Cable Systems Ltd
  • EEW
    EEW Special Pipe Constructions GmbH
  • EDF
    EDF
reNEWS
LinkedIn Facebook X (Twitter)
reMIX | Company Profiles | Industry Events
Get in touch | Advertising with us | About reNEWS

© 2026 Lewis Business Media. All Rights Reserved.
Lewis Business Media, Suite A, Arun House, Office Village, River Way, Uckfield, TN22 1SL

Terms and Conditions | Privacy Policy | Cookie Policy

Type above and press Enter to search. Press Esc to cancel.

Manage Consent
To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behaviour or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.
Functional Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
  • Manage options
  • Manage services
  • Manage {vendor_count} vendors
  • Read more about these purposes
View preferences
  • {title}
  • {title}
  • {title}