UK contractor HBC Group has wrapped up a three-year subsea inspection campaign for Orsted at four offshore wind farms.
The work was carried out at the 573MW Race Bank project off the east coast of England and at the 312MW Borkum Riffgrund 1 and the 582MW Gode 1 and 2 wind farms in the German North Sea.
HBC Group said it performed a variety of subsea inspection and maintenance tasks during the campaign, without elaborating further.
“The great dedication and collaboration between Orsted and HBC ensured the success and safety of the campaign,” HBC Group said.
Image: Race Bank (Orsted)


