Close Menu
reNEWSreNEWS
  • Home
  • Offshore Wind
  • Onshore Wind
  • Solar
  • Other News
    • Energy Storage
    • Finance
    • Grid
    • People
    • reMIX
  • More
    • Company Profiles
    • Events
    • National Wind Energy Awards 2026
Latest News

PODCAST: Is UK offshore wind back on track?

All-Energy 2026: Shanks bullish on UK clean power

GWEC, TÜREB launch wind partnership

LinkedIn Facebook X (Twitter)
LinkedIn Facebook X (Twitter)
  • Email Briefings
  • About
  • Advertise
  • Contact
reNEWSreNEWS
  • Home
  • Offshore Wind

    PODCAST: Is UK offshore wind back on track?

    May 13, 2026

    UK offshore wind pipeline reaches 93GW

    May 13, 2026

    Seaway7 completes Hai Long cable works

    May 13, 2026

    DEME names new jack-up vessel

    May 13, 2026

    Mubadala invests $325m into Hornsea 3

    May 13, 2026
  • Onshore Wind

    ENERCON to build Türkiye blade plant

    May 13, 2026

    ‘Fatality at South Korean wind farm’

    May 13, 2026

    Scottish onshore wind forum launches

    May 12, 2026

    ENOVA starts 30MW Hiddels repowering

    May 12, 2026

    Iberdrola buys 40MW Italian wind farm

    May 12, 2026
  • Solar

    VSB secures Sicily PV project approval

    May 13, 2026

    Matrix connects two Spanish renewable projects

    May 13, 2026

    Qualitas targets €10bn energy investments

    May 12, 2026

    Consultation opens for 49.9MW Barrons Solar

    May 12, 2026

    Great North Road solar nears decision

    May 11, 2026
  • Other News
    • Energy Storage
    • Finance
    • Grid
    • People
    • reMIX
  • More
    • Company Profiles
    • Events
    • National Wind Energy Awards 2026
LinkedIn Facebook X (Twitter)
reNEWSreNEWS
Home » Uncategorized » BSR Energy challenges Welsh solar planning decision
Solar

BSR Energy challenges Welsh solar planning decision

SaraBy SaraJuly 27, 20232 Mins Read
BSR Energy challenges Welsh solar planning decision

BSR Energy has challenged the decision by the Welsh Minister not to grant planning consent to its 75MW Rush Wall Solar Park project in south Wales.

The Minister’s decision was announced in June 2023, despite the project having been recommended for approval in the Inspector’s Report, BSR said.

Advertisement

A spokesperson for BSR Energy said: “Although we were disappointed by the Welsh Minister’s decision on the proposed Rush Wall Solar Park, we were encouraged by the Inspector’s Report, which highlighted the significant benefits the scheme would deliver.

“Our site selection process was robust and followed planning policy.

“We looked at a wide range of factors in selecting a site, such as the location of electrical connections, environmental and planning designations, existing land use, agricultural land classification, visual impact, topography, and cumulative impacts.

“The project’s ability to connect to the UK’s national electricity grid is the most significant benefit of the site.

“The Rush Wall site is part of an SSSI designation, and a full environmental statement was produced highlighting a range of natural protections and betterments the development will secure. Detailed assessments were undertaken by our environmental consultants, which led to a scheme design that is sensitive towards and compatible with the local landscape and environment.”

BSR Energy submitted its application for planning consent to Planning and Environment Decisions Wales in March 2022.

The application was for the development of ancillary electrical equipment and infrastructure, access tracks, security fencing and CCTV.

The operational lifespan of the project would be 35 years.

Biodiversity net gain (BNG) is a key priority for BSR Energy on all its sites.

The UK government is set to introduce a minimum target of 10% BNG for large developments such as solar parks from November 2023, but BSR Energy already goes a step beyond this to target a minimum 60% gain on its developments, the company said.

BSR Energy Solar
Share. Facebook LinkedIn Bluesky Twitter Reddit Email Copy Link
Previous ArticleShell clean energy earnings fall in Q2
Next Article First Solar inks 2.1GW module deal with Matrix

Related News

Essex council approves BSR PV project

May 31, 2024

Asset manager ICG secures majority share in BSR

July 29, 2022

BSR submits plans for 75MW Welsh solar park

May 5, 2022
Advertisement

Latest News

PODCAST: Is UK offshore wind back on track?

May 13, 2026

All-Energy 2026: Shanks bullish on UK clean power

May 13, 2026

GWEC, TÜREB launch wind partnership

May 13, 2026

ENERCON to build Türkiye blade plant

May 13, 2026
Advertisement

Advertisement

Company Profiles
  • Collett & Sons Ltd
  • Leask Marine
  • Qualsurv Marine Consulting
    Qualsurv Marine Consulting
  • Pembroke Port
  • Oceantic Network
  • Navantia Seanergies
    Navantia Seanergies
  • Natural Power
    Natural Power
  • Full Circle Wind Services
  • EEW
    EEW Special Pipe Constructions GmbH
  • Bilfinger UK
reNEWS
LinkedIn Facebook X (Twitter)
reMIX | Company Profiles | Industry Events
Get in touch | Advertising with us | About reNEWS

© 2026 Lewis Business Media. All Rights Reserved.
Lewis Business Media, Suite A, Arun House, Office Village, River Way, Uckfield, TN22 1SL

Terms and Conditions | Privacy Policy | Cookie Policy

Type above and press Enter to search. Press Esc to cancel.

Manage Consent
To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behaviour or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.
Functional Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
  • Manage options
  • Manage services
  • Manage {vendor_count} vendors
  • Read more about these purposes
View preferences
  • {title}
  • {title}
  • {title}