NKT cable-laying vessel to run on biofuelsBy reNEWS EditorialSeptember 25, 2023 The NKT Victoria will be able to run on hydrotreated vegetable oil
The NKT Victoria, which is currently performing cable laying work for the Shetland HVDC interconnector projectBy reNEWS EditorialMarch 20, 2023 The NKT Victoria, which is currently performing cable laying work for the Shetland HVDC interconnector project
Penultimate cable laying starts at Shetland HVDC interconnectorBy reNEWS EditorialMarch 20, 2023 The link is scheduled to be completed by summer 2024