Close Menu
reNEWSreNEWS
  • Home
  • Offshore Wind
  • Onshore Wind
  • Solar
  • Other News
    • Energy Storage
    • Finance
    • Grid
    • People
    • reMIX
  • More
    • Company Profiles
    • Events
    • National Wind Energy Awards 2026
Latest News

PODCAST: Is UK offshore wind back on track?

All-Energy 2026: Shanks bullish on UK clean power

GWEC, TÜREB launch wind partnership

LinkedIn Facebook X (Twitter)
LinkedIn Facebook X (Twitter)
  • Email Briefings
  • About
  • Advertise
  • Contact
reNEWSreNEWS
  • Home
  • Offshore Wind

    PODCAST: Is UK offshore wind back on track?

    May 13, 2026

    UK offshore wind pipeline reaches 93GW

    May 13, 2026

    Seaway7 completes Hai Long cable works

    May 13, 2026

    DEME names new jack-up vessel

    May 13, 2026

    Mubadala invests $325m into Hornsea 3

    May 13, 2026
  • Onshore Wind

    ENERCON to build Türkiye blade plant

    May 13, 2026

    ‘Fatality at South Korean wind farm’

    May 13, 2026

    Scottish onshore wind forum launches

    May 12, 2026

    ENOVA starts 30MW Hiddels repowering

    May 12, 2026

    Iberdrola buys 40MW Italian wind farm

    May 12, 2026
  • Solar

    VSB secures Sicily PV project approval

    May 13, 2026

    Matrix connects two Spanish renewable projects

    May 13, 2026

    Qualitas targets €10bn energy investments

    May 12, 2026

    Consultation opens for 49.9MW Barrons Solar

    May 12, 2026

    Great North Road solar nears decision

    May 11, 2026
  • Other News
    • Energy Storage
    • Finance
    • Grid
    • People
    • reMIX
  • More
    • Company Profiles
    • Events
    • National Wind Energy Awards 2026
LinkedIn Facebook X (Twitter)
reNEWSreNEWS
Home » Uncategorized » Work starts at SSE Renewables Scottish hydro project
Hydro

Work starts at SSE Renewables Scottish hydro project

Eleanore RobinsonBy Eleanore RobinsonDecember 14, 20222 Mins Read
Work starts at SSE Renewables Scottish hydro project

Exploratory works at the site of what would be the UK’s first large-scale pumped storage scheme to be developed in 30 years have commenced at Loch Lochy (pictured) in the Great Glen in the Scottish Highlands.

SSE Renewables selected Strabag UK, a world leader in mining and tunnelling projects, to undertake the work earlier this year.

Advertisement

The company which has extensive experience in complex infrastructure and ground engineering, was named the preferred tenderer to carry out the work after a rigorous selection process which concluded in April.

The work will see the creation of a tunnel approximately four metres wide and up to one kilometre long, which will cut into the hillside towards the proposed location of the underground powerhouse complex.

Samples of the materials within the hill will be analysed, and survey and assessment work will be carried out to give a detailed understanding of the geological conditions.

The information will then be used in detailed design of underground structures.

The findings of the exploratory works will be used to inform the final design of the project and will be an important consideration in SSE Renewables’ final decision on whether to proceed with the Coire Glas project.

Coire Glas project director Ian Innes said: “Coire Glas is one of the most significant engineering projects to take place in the UK for decades.

“The commencement of these exploratory works is a great milestone for everyone on the Coire Glas Project Team and at SSE Renewables.

“With a reputation for innovation and delivering a wide variety of specialist skills and services on major construction projects, I am confident that Strabag UK’s experience will prove an asset as we undertake this critical phase in the development of the Coire Glas project.”

In November 2021, SSE Renewables’ parent company, SSE PLC unveiled its Net Zero Acceleration Programme (NZAP) which commits to investing around £7m a day on critical low-carbon infrastructure needed in net zero transition.

Major infrastructure projects including Coire Glas are at the heart of the NZAP with a target to double its installed capacity by 2026 and more than treble it by 2031, increasing output fivefold to over 50TWh annually.

Hydro Scotland SSE Renewables
Share. Facebook LinkedIn Bluesky Twitter Reddit Email Copy Link
Previous Article1GW Uzbekistan projects receives US$520m in financing
Next Article Denmark considers Vesterhav Syd onshore installations

Related News

SSE wins award for hydro project

September 10, 2025

SSE completes Coire Glas tunnel

August 9, 2024

SSE reveals Coire Glas hydro tender shortlist

June 1, 2022
Advertisement

Latest News

PODCAST: Is UK offshore wind back on track?

May 13, 2026

All-Energy 2026: Shanks bullish on UK clean power

May 13, 2026

GWEC, TÜREB launch wind partnership

May 13, 2026

ENERCON to build Türkiye blade plant

May 13, 2026
Advertisement

Advertisement

Company Profiles
  • Leask Marine
  • Qualsurv Marine Consulting
    Qualsurv Marine Consulting
  • Pembroke Port
  • Ørsted
  • Oceantic Network
  • Natural Power
    Natural Power
  • LSP
    LSP Renewables
  • Full Circle Wind Services
  • EDF
    EDF
  • Brightwind
    BrightWind Limited
reNEWS
LinkedIn Facebook X (Twitter)
reMIX | Company Profiles | Industry Events
Get in touch | Advertising with us | About reNEWS

© 2026 Lewis Business Media. All Rights Reserved.
Lewis Business Media, Suite A, Arun House, Office Village, River Way, Uckfield, TN22 1SL

Terms and Conditions | Privacy Policy | Cookie Policy

Type above and press Enter to search. Press Esc to cancel.

Manage Consent
To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behaviour or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.
Functional Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
  • Manage options
  • Manage services
  • Manage {vendor_count} vendors
  • Read more about these purposes
View preferences
  • {title}
  • {title}
  • {title}