MHI Vestas waves off the third and final V164-8.4 MW turbine atop Principle Power’s semi-submersible foundation as it sets sail for the 25MW WindFloat Atlantic site, 19km off the coast of Portugal
MHI Vestas waves off the third and final V164-8.4 MW turbine atop Principle Power’s semi-submersible foundation as it sets sail for the 25MW WindFloat Atlantic site, 19km off the coast of Portugal.