Dutch outfit EWT has installed two DW61-900kW turbines at an organic vegetable farm in Tasinge in Denmark.
EWT will also provide 24/7 condition monitoring, product and performance warranties and preventive maintenance for the hardware.
The turbines, which are expected to be connected to the grid mid-December, are the first EWT has installed in Denmark.
Skiftekær Økologi vegetable farm owner Peter Bay said: “EWT came into the picture because they have sub-megawatt turbines which are the ideal fit for one sized projects; like ours for self-consumption purposes.”
Image: EWT


