Close Menu
reNEWSreNEWS
  • Home
  • Offshore Wind
  • Onshore Wind
  • Solar
  • Other News
    • Energy Storage
    • Finance
    • Grid
    • People
    • reMIX
  • More
    • Company Profiles
    • Events
    • National Wind Energy Awards 2026
Latest News

PODCAST: Is UK offshore wind back on track?

All-Energy 2026: Shanks bullish on UK clean power

GWEC, TÜREB launch wind partnership

LinkedIn Facebook X (Twitter)
LinkedIn Facebook X (Twitter)
  • Email Briefings
  • About
  • Advertise
  • Contact
reNEWSreNEWS
  • Home
  • Offshore Wind

    PODCAST: Is UK offshore wind back on track?

    May 13, 2026

    UK offshore wind pipeline reaches 93GW

    May 13, 2026

    Seaway7 completes Hai Long cable works

    May 13, 2026

    DEME names new jack-up vessel

    May 13, 2026

    Mubadala invests $325m into Hornsea 3

    May 13, 2026
  • Onshore Wind

    ENERCON to build Türkiye blade plant

    May 13, 2026

    ‘Fatality at South Korean wind farm’

    May 13, 2026

    Scottish onshore wind forum launches

    May 12, 2026

    ENOVA starts 30MW Hiddels repowering

    May 12, 2026

    Iberdrola buys 40MW Italian wind farm

    May 12, 2026
  • Solar

    VSB secures Sicily PV project approval

    May 13, 2026

    Matrix connects two Spanish renewable projects

    May 13, 2026

    Qualitas targets €10bn energy investments

    May 12, 2026

    Consultation opens for 49.9MW Barrons Solar

    May 12, 2026

    Great North Road solar nears decision

    May 11, 2026
  • Other News
    • Energy Storage
    • Finance
    • Grid
    • People
    • reMIX
  • More
    • Company Profiles
    • Events
    • National Wind Energy Awards 2026
LinkedIn Facebook X (Twitter)
reNEWSreNEWS
Home»Offshore Wind
Offshore Wind

Accelerator spotlights jacket fatigue

New £2.4m project aims to improve foundation design and reduce costs
EBSBy EBSFebruary 22, 20172 Mins Read
Share LinkedIn Facebook Twitter Bluesky Reddit Copy Link Email
SMD cuts jobs in tough market

The Carbon Trust’s Offshore Wind Accelerator (OWA) has launched a new project aiming to optimise the design of jacket foundations through improved fatigue standards and validation of faster testing and fabrication methods.

The £2.4m Improved Fatigue Life of Welded Jacket Connections (JaCo) project targets a better understanding of fatigue performance, OWA said.

It said the three-year project will test full-size jacket nodes made from existing manual and novel automated welding processes.  

“Coupled with improved standards it is estimated that a weight reduction of 10% can be achieved if the fatigue resistance (strength) is enhanced by 10-20% through optimised design,” OWA said.

It added that the industry trend towards deeper water and larger wind turbines presents an opportunity to optimise jacket foundations, which consist primarily of welded tubular space frames fabricated in steel.

Each welded connection point is termed a node and fatigue at these welds is an important design consideration that often proves to be the limiting factor, OWA said.

The project will include collaboration between developers, supply chain, research organisations and government, with Belgian material research centre OCAS providing testing techniques to reduce the time needed to complete fatigue tests. 

The project will also be guided by a panel of independent experts, including Cranfield University, DNV GL, Bureau Veritas and the Federal Institute for Materials Research and Testing, OWA said.

Carbon Trust director of offshore wind Jan Matthiesen said: “With an increasing trend of larger turbines that will be installed in deeper waters, we will see a growth in the use of more economic jacket structures.

“We have launched this project to drive cost reductions by optimising such structures.

“In addition, this project will aim to demonstrate the performance of robotic welding, which will allow the supply chain to fabricate at industrial scale.”

Image: Carbon Trust



Carbon Trust Europe Offshore Wind UK

Related Stories

Sif and partners hail monopile welding ‘breakthrough’

May 11, 2023

Taiwanese receive offshore boost from Orsted fund

January 11, 2021

Lift off for Carbon Trust offshore wind accelerator phase four

October 27, 2020
Advertisement

Latest News

PODCAST: Is UK offshore wind back on track?

May 13, 2026

All-Energy 2026: Shanks bullish on UK clean power

May 13, 2026

GWEC, TÜREB launch wind partnership

May 13, 2026

ENERCON to build Türkiye blade plant

May 13, 2026
Advertisement

Advertisement

Company Profiles
  • Collett & Sons Ltd
  • Seaway7
    Seaway7
  • Qualsurv Marine Consulting
    Qualsurv Marine Consulting
  • Ørsted
  • Natural Power
    Natural Power
  • JDR Cable Systems Ltd
  • EEW
    EEW Special Pipe Constructions GmbH
  • EDF
    EDF
  • Brightwind
    BrightWind Limited
  • Bilfinger UK
reNEWS
LinkedIn Facebook X (Twitter)
reMIX | Company Profiles | Industry Events
Get in touch | Advertising with us | About reNEWS

© 2026 Lewis Business Media. All Rights Reserved.
Lewis Business Media, Suite A, Arun House, Office Village, River Way, Uckfield, TN22 1SL

Terms and Conditions | Privacy Policy | Cookie Policy

Type above and press Enter to search. Press Esc to cancel.

Manage Consent
To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behaviour or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.
Functional Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
  • Manage options
  • Manage services
  • Manage {vendor_count} vendors
  • Read more about these purposes
View preferences
  • {title}
  • {title}
  • {title}