Close Menu
reNEWSreNEWS
  • Home
  • Offshore Wind
  • Onshore Wind
  • Solar
  • Other News
    • Energy Storage
    • Finance
    • Grid
    • People
    • reMIX
  • More
    • Company Profiles
    • Events
    • National Wind Energy Awards 2026
Latest News

PODCAST: Is UK offshore wind back on track?

All-Energy 2026: Shanks bullish on UK clean power

GWEC, TÜREB launch wind partnership

LinkedIn Facebook X (Twitter)
LinkedIn Facebook X (Twitter)
  • Email Briefings
  • About
  • Advertise
  • Contact
reNEWSreNEWS
  • Home
  • Offshore Wind

    PODCAST: Is UK offshore wind back on track?

    May 13, 2026

    UK offshore wind pipeline reaches 93GW

    May 13, 2026

    Seaway7 completes Hai Long cable works

    May 13, 2026

    DEME names new jack-up vessel

    May 13, 2026

    Mubadala invests $325m into Hornsea 3

    May 13, 2026
  • Onshore Wind

    ENERCON to build Türkiye blade plant

    May 13, 2026

    ‘Fatality at South Korean wind farm’

    May 13, 2026

    Scottish onshore wind forum launches

    May 12, 2026

    ENOVA starts 30MW Hiddels repowering

    May 12, 2026

    Iberdrola buys 40MW Italian wind farm

    May 12, 2026
  • Solar

    VSB secures Sicily PV project approval

    May 13, 2026

    Matrix connects two Spanish renewable projects

    May 13, 2026

    Qualitas targets €10bn energy investments

    May 12, 2026

    Consultation opens for 49.9MW Barrons Solar

    May 12, 2026

    Great North Road solar nears decision

    May 11, 2026
  • Other News
    • Energy Storage
    • Finance
    • Grid
    • People
    • reMIX
  • More
    • Company Profiles
    • Events
    • National Wind Energy Awards 2026
LinkedIn Facebook X (Twitter)
reNEWSreNEWS
Home » Uncategorized » Belgian offshore wind produced 7TWh in 2024
Grid

Belgian offshore wind produced 7TWh in 2024

Michael Lee-MurphyBy Michael Lee-MurphyJanuary 10, 20252 Mins Read
Belgian offshore wind produced 7TWh in 2024

Belgian North Sea wind farms accounted for 8.7% of Belgian electricity consumption in 2024, according to figures from the trade group Belgian Offshore Platform (BOP). 

The nine wind farms had a total production of approximately 7.07 TWh, or roughly the annual electricity needs of 2m families. 

Advertisement

Belgium’s offshore wind farms have a total capacity of 2.26GW, and the country is ranked fifth in Europe behind the United Kingdom (14.8 GW), Germany (8.85 GW), the Netherlands (4.7 GW) and Denmark (2.7 GW).

While 2024 got off to a good start for the wind farms, the wind was below average in the summer and autumn, resulting in a total production below 2023 when the wind farms contributed 8 TWh. 

BOP pointed to three new wind farms in the Princess Elisabeth development zone, poised to bring the Belgian offshore wind production to 5.8GW. 

The public tender for the first 700MW opened in November, and the winner is expected to be announced at the end of 2025. 

The wind farm will have to be built before the end of 2030. 

BOP did outline a number of challenges still facing the sector, however. 

Any additional developments at sea will depend on two network investments, BOP said. 

Belgian transmission system operator Elia does not yet have a permit for its Ventilus high-voltage connection, effectively blocking the transmission of any electricity from Belgian wind farms. 

The uncertainty leaves offshore wind developers in the dark about when new wind farms will be able to feed electricity into the grid, despite the construction timelines established in the tender. 

Another problem is the slow progress of Elia’s Boucle du Hainaut network reinforcement project. 

The TSO’s current solution, BOP said, is a flexible connection allowing the disconnection of wind farms without compensation. 

The strategy is an “unacceptable and illogical” transfer of operating risk from the network manager to the wind farms, resulting in increased financial risk and rising electricity costs, BOP said.

 The trade group called for the ipact of future grid tariff increases to be “neutralized” within the framework of the contracts for difference going forward. 

Belgium belwind BOP boucle du hainot C-Power Elia Mermaid nobelwind Northwester 2 Northwind Rentel Seastar ventilus
Share. Facebook LinkedIn Bluesky Twitter Reddit Email Copy Link
Previous ArticleNordex bags 359MW of orders from Greece and Spain
Next Article SBM Offshore sells shares in Floventis

Related News

North Sea offshore share rises 13% in Germany

February 10, 2026

Work starts on Belgium energy island

April 30, 2025

EU approves 700MW Belgian auction

September 16, 2024
Advertisement

Latest News

PODCAST: Is UK offshore wind back on track?

May 13, 2026

All-Energy 2026: Shanks bullish on UK clean power

May 13, 2026

GWEC, TÜREB launch wind partnership

May 13, 2026

ENERCON to build Türkiye blade plant

May 13, 2026
Advertisement

Advertisement

Company Profiles
  • TGS
  • Seaway7
    Seaway7
  • Qualsurv Marine Consulting
    Qualsurv Marine Consulting
  • Pembroke Port
  • Ørsted
  • Oceantic Network
  • Navantia Seanergies
    Navantia Seanergies
  • LSP
    LSP Renewables
  • JDR Cable Systems Ltd
  • Full Circle Wind Services
reNEWS
LinkedIn Facebook X (Twitter)
reMIX | Company Profiles | Industry Events
Get in touch | Advertising with us | About reNEWS

© 2026 Lewis Business Media. All Rights Reserved.
Lewis Business Media, Suite A, Arun House, Office Village, River Way, Uckfield, TN22 1SL

Terms and Conditions | Privacy Policy | Cookie Policy

Type above and press Enter to search. Press Esc to cancel.

Manage Consent
To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behaviour or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.
Functional Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
  • Manage options
  • Manage services
  • Manage {vendor_count} vendors
  • Read more about these purposes
View preferences
  • {title}
  • {title}
  • {title}