Close Menu
reNEWSreNEWS
  • Home
  • Offshore Wind
  • Onshore Wind
  • Solar
  • Other News
    • Energy Storage
    • Finance
    • Grid
    • People
    • reMIX
  • More
    • Company Profiles
    • Events
    • National Wind Energy Awards 2026
Latest News

PODCAST: Is UK offshore wind back on track?

All-Energy 2026: Shanks bullish on UK clean power

GWEC, TÜREB launch wind partnership

LinkedIn Facebook X (Twitter)
LinkedIn Facebook X (Twitter)
  • Email Briefings
  • About
  • Advertise
  • Contact
reNEWSreNEWS
  • Home
  • Offshore Wind

    PODCAST: Is UK offshore wind back on track?

    May 13, 2026

    UK offshore wind pipeline reaches 93GW

    May 13, 2026

    Seaway7 completes Hai Long cable works

    May 13, 2026

    DEME names new jack-up vessel

    May 13, 2026

    Mubadala invests $325m into Hornsea 3

    May 13, 2026
  • Onshore Wind

    ENERCON to build Türkiye blade plant

    May 13, 2026

    ‘Fatality at South Korean wind farm’

    May 13, 2026

    Scottish onshore wind forum launches

    May 12, 2026

    ENOVA starts 30MW Hiddels repowering

    May 12, 2026

    Iberdrola buys 40MW Italian wind farm

    May 12, 2026
  • Solar

    VSB secures Sicily PV project approval

    May 13, 2026

    Matrix connects two Spanish renewable projects

    May 13, 2026

    Qualitas targets €10bn energy investments

    May 12, 2026

    Consultation opens for 49.9MW Barrons Solar

    May 12, 2026

    Great North Road solar nears decision

    May 11, 2026
  • Other News
    • Energy Storage
    • Finance
    • Grid
    • People
    • reMIX
  • More
    • Company Profiles
    • Events
    • National Wind Energy Awards 2026
LinkedIn Facebook X (Twitter)
reNEWSreNEWS
Home » Uncategorized » Carbon Trust issues cable failure advice
Offshore Wind

Carbon Trust issues cable failure advice

SaraBy SaraFebruary 11, 20212 Mins Read
Seamade energises export wires

New recommendations for fibre optic cable design to mitigate the risk of export cable failure have been published by the Offshore Wind Accelerator (OWA) in the UK.

The cost-effective design changes are the outcome of the Fibre Optic Cable Protection Assessment project managed by the Carbon Trust and funded by OWA partners EnBW, Equinor, Orsted, RWE, ScottishPower Renewables, Shell, SSE Renewables, and Vattenfall.

Advertisement

The recommendations are likely to increase the cost of the export cable by between 0-0.5% depending on the design that it replaces and will not affect the installation cost.

Therefore, overall savings remain significant based on the costs incurred through cable failure.

In 2017, the UK’s Offshore Wind Programme Board published a review of high voltage export cable reliability, showing that of the seven post-commissioning failures the UK offshore wind industry had experienced, issues in the fibre optic cable were responsible for six.

Each failure was estimated to have cost just under £23m in both the cost of repairs and loss of wind farm energy production.

Following the industry identifying cable failure as a high-profile issue, Orsted and Nexans each produced modelling to investigate the mechanism of failure, identifying the fibre optic core as the cause.

The OWA’s Cables Working Group then commissioned the Fibre Optic Cable Protection Assessment project to validate this modelling, and suggest design recommendations to mitigate risk.

This was undertaken by engineers at RINA Tech UK.

There are five key recommendations in total, including emcompassing the optical fibres with stainless steel tubing and stainless-steel wire armour, with no insulating binder tapes, adhesives or other insulating material between the armour wires and sheath of the fibre optic cables.

The three-core cable should have extruded fillers that are made from semi-conducting material, or have a semi-conducting section around the channel for the fibre optic cable.

The position of the fibre optic cable within the three-core cable remains unchanged from present practice.

Carbon Trust Offshore Wind Orsted RWE Vattenfall
Share. Facebook LinkedIn Bluesky Twitter Reddit Email Copy Link
Previous ArticleScottish solar-storage project undergoes review
Next Article Scottish firms ‘piling into offshore wind’

Related News

Carbon Trust looks to step up array cable voltages

June 22, 2022

Lift off for Carbon Trust offshore wind accelerator phase four

October 27, 2020

California lab explores fibre optic offshore sensors

March 31, 2020
Advertisement

Latest News

PODCAST: Is UK offshore wind back on track?

May 13, 2026

All-Energy 2026: Shanks bullish on UK clean power

May 13, 2026

GWEC, TÜREB launch wind partnership

May 13, 2026

ENERCON to build Türkiye blade plant

May 13, 2026
Advertisement

Advertisement

Company Profiles
  • Collett & Sons Ltd
  • Seaway7
    Seaway7
  • Qualsurv Marine Consulting
    Qualsurv Marine Consulting
  • Pembroke Port
  • Ørsted
  • Oceantic Network
  • Navantia Seanergies
    Navantia Seanergies
  • JDR Cable Systems Ltd
  • Full Circle Wind Services
  • EDF
    EDF
reNEWS
LinkedIn Facebook X (Twitter)
reMIX | Company Profiles | Industry Events
Get in touch | Advertising with us | About reNEWS

© 2026 Lewis Business Media. All Rights Reserved.
Lewis Business Media, Suite A, Arun House, Office Village, River Way, Uckfield, TN22 1SL

Terms and Conditions | Privacy Policy | Cookie Policy

Type above and press Enter to search. Press Esc to cancel.

Manage Consent
To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behaviour or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.
Functional Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
  • Manage options
  • Manage services
  • Manage {vendor_count} vendors
  • Read more about these purposes
View preferences
  • {title}
  • {title}
  • {title}