Close Menu
reNEWSreNEWS
  • Home
  • Offshore Wind
  • Onshore Wind
  • Solar
  • Other News
    • Energy Storage
    • Finance
    • Grid
    • People
    • reMIX
  • More
    • Company Profiles
    • Events
    • National Wind Energy Awards 2026
Latest News

PODCAST: Is UK offshore wind back on track?

All-Energy 2026: Shanks bullish on UK clean power

GWEC, TÜREB launch wind partnership

LinkedIn Facebook X (Twitter)
LinkedIn Facebook X (Twitter)
  • Email Briefings
  • About
  • Advertise
  • Contact
reNEWSreNEWS
  • Home
  • Offshore Wind

    PODCAST: Is UK offshore wind back on track?

    May 13, 2026

    UK offshore wind pipeline reaches 93GW

    May 13, 2026

    Seaway7 completes Hai Long cable works

    May 13, 2026

    DEME names new jack-up vessel

    May 13, 2026

    Mubadala invests $325m into Hornsea 3

    May 13, 2026
  • Onshore Wind

    ENERCON to build Türkiye blade plant

    May 13, 2026

    ‘Fatality at South Korean wind farm’

    May 13, 2026

    Scottish onshore wind forum launches

    May 12, 2026

    ENOVA starts 30MW Hiddels repowering

    May 12, 2026

    Iberdrola buys 40MW Italian wind farm

    May 12, 2026
  • Solar

    VSB secures Sicily PV project approval

    May 13, 2026

    Matrix connects two Spanish renewable projects

    May 13, 2026

    Qualitas targets €10bn energy investments

    May 12, 2026

    Consultation opens for 49.9MW Barrons Solar

    May 12, 2026

    Great North Road solar nears decision

    May 11, 2026
  • Other News
    • Energy Storage
    • Finance
    • Grid
    • People
    • reMIX
  • More
    • Company Profiles
    • Events
    • National Wind Energy Awards 2026
LinkedIn Facebook X (Twitter)
reNEWSreNEWS
Home » Uncategorized » Rovco receives Galloper Offshore Wind Farm contract
Offshore Wind

Rovco receives Galloper Offshore Wind Farm contract

reNEWS EditorialBy reNEWS EditorialOctober 25, 20222 Mins Read
Rovco receives Galloper Offshore Wind Farm contract

Subsea robotic and hydrographic survey group Rovco has received a contract to provide offshore rock bag deployment and installation at the Galloper Offshore Wind Farm in the Outer Thames Estuary.

The project scope covers the application of an operator engineered solution for the installation of rock bags, which need to be placed at precise locations on and around the Cable Protection Systems (CPS) on the wind farm, located 27km off the Suffolk coast.

Advertisement

Following previous subsea surveys, rock bag placement was selected from a number of options considered by the operator as the most suitable solution to eliminate or vastly reduce excess cable movement of the CPS, stabilising and prolonging the life of the array cables which carry the generated electricity from the wind turbines.

Rovco will deploy the DPII subsea support vessel VOS Star, on charter from Vroon Offshore Services, during the project. The vessel will be pre-installed with cutting-edge survey equipment and Rovco’s powerful Seaeye Leopard WROV which will be fully calibrated, and system tested for swift commencement.

The project is led by personnel from Rovco’s experienced offshore team and a dedicated onshore project manager who will be assigned to the project throughout, to ensure safe and efficient operations.

The 353MW Galloper Offshore Wind Farm has a site area of 180sq km with wind turbine generators located in depths between 26.5m-39.5m (LAT). Galloper’s 56 turbines will generate enough green electricity every year to power the equivalent of more than 380,000 average homes in the UK.

Sean Chenery, General Manager at Galloper Offshore Wind Farm said: “We selected Rovco to install the rock bag solution due to their knowledge, experience and competitiveness in subsea operations. Placing rock bags on live cables at water depths of 26m-39m with tight tolerances is where Rovco’s equipment excels.”

Simon Miller, Chief Revenue Officer of Rovco, and its sister company Vaarst, added: “Engineering solutions to extend the life of critical subsea infrastructure and ensuring uptime of these offshore assets and installations is crucial.

“This award by Galloper Offshore Wind Farm, to help them detect issues and implement their designed solution post engineering analysis, is testament to our team’s efforts across the company and real recognition of our growing presence in this market.”

contract England Galloper Offshore Wind Farm Offshore Wind Renewable energy news robotic rock bags ROV Rovco subsea UK
Share. Facebook LinkedIn Bluesky Twitter Reddit Email Copy Link
Previous ArticleRWE connects 28.5MW Bedburg A 44n wind farm
Next Article GES commissions Spanish wind farm

Related News

Rovco selected for Outer Dowsing surveys

May 22, 2024

Orsted secures Rovco for two US projects

April 22, 2024

Rovco renews Beatrice survey work

June 16, 2022
Advertisement

Latest News

PODCAST: Is UK offshore wind back on track?

May 13, 2026

All-Energy 2026: Shanks bullish on UK clean power

May 13, 2026

GWEC, TÜREB launch wind partnership

May 13, 2026

ENERCON to build Türkiye blade plant

May 13, 2026
Advertisement

Advertisement

Company Profiles
  • Collett & Sons Ltd
  • Leask Marine
  • TGS
  • Seaway7
    Seaway7
  • Qualsurv Marine Consulting
    Qualsurv Marine Consulting
  • Pembroke Port
  • Natural Power
    Natural Power
  • LSP
    LSP Renewables
  • JDR Cable Systems Ltd
  • Bilfinger UK
reNEWS
LinkedIn Facebook X (Twitter)
reMIX | Company Profiles | Industry Events
Get in touch | Advertising with us | About reNEWS

© 2026 Lewis Business Media. All Rights Reserved.
Lewis Business Media, Suite A, Arun House, Office Village, River Way, Uckfield, TN22 1SL

Terms and Conditions | Privacy Policy | Cookie Policy

Type above and press Enter to search. Press Esc to cancel.

Manage Consent
To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behaviour or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.
Functional Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
  • Manage options
  • Manage services
  • Manage {vendor_count} vendors
  • Read more about these purposes
View preferences
  • {title}
  • {title}
  • {title}