Close Menu
reNEWSreNEWS
  • Home
  • Offshore Wind
  • Onshore Wind
  • Solar
  • Other News
    • Energy Storage
    • Finance
    • Grid
    • People
    • reMIX
  • More
    • Company Profiles
    • Events
    • National Wind Energy Awards 2026
Latest News

PODCAST: Is UK offshore wind back on track?

All-Energy 2026: Shanks bullish on UK clean power

GWEC, TÜREB launch wind partnership

LinkedIn Facebook X (Twitter)
LinkedIn Facebook X (Twitter)
  • Email Briefings
  • About
  • Advertise
  • Contact
reNEWSreNEWS
  • Home
  • Offshore Wind

    PODCAST: Is UK offshore wind back on track?

    May 13, 2026

    UK offshore wind pipeline reaches 93GW

    May 13, 2026

    Seaway7 completes Hai Long cable works

    May 13, 2026

    DEME names new jack-up vessel

    May 13, 2026

    Mubadala invests $325m into Hornsea 3

    May 13, 2026
  • Onshore Wind

    ENERCON to build Türkiye blade plant

    May 13, 2026

    ‘Fatality at South Korean wind farm’

    May 13, 2026

    Scottish onshore wind forum launches

    May 12, 2026

    ENOVA starts 30MW Hiddels repowering

    May 12, 2026

    Iberdrola buys 40MW Italian wind farm

    May 12, 2026
  • Solar

    VSB secures Sicily PV project approval

    May 13, 2026

    Matrix connects two Spanish renewable projects

    May 13, 2026

    Qualitas targets €10bn energy investments

    May 12, 2026

    Consultation opens for 49.9MW Barrons Solar

    May 12, 2026

    Great North Road solar nears decision

    May 11, 2026
  • Other News
    • Energy Storage
    • Finance
    • Grid
    • People
    • reMIX
  • More
    • Company Profiles
    • Events
    • National Wind Energy Awards 2026
LinkedIn Facebook X (Twitter)
reNEWSreNEWS
Home » Uncategorized » GE to supply batteries for UK solar-storage project
Energy Storage

GE to supply batteries for UK solar-storage project

SaraBy SaraAugust 27, 20202 Mins Read
GE to supply batteries for UK solar-storage project

GE Renewable Energy has secured an agreement to deliver a 25MW energy storage system to be integrated with solar at a renewable energy park in the UK.

Wykes, the developer, chose GE to supply the system for its Chelveston Renewable Energy Park, which operates with 60MW of solar and 26MW of wind.

Advertisement

The wind farm features GE’s 2.85MW onshore wind turbines.

Wykes will use GE’s Reservoir energy storage technology to add another 60MW of solar capacity to the facility.

The DC-coupled system will enable the PV array and batteries to share a common set of power conversion equipment, enhancing the overall energy output of the solar-storage hybrid system.

The configuration will optimise costs and increase the overall system reliability and flexibility, GE said.

Chelveston represents the UK’s first DC-coupled solar-storage plant in the UK.

Wykes engineering manager Scott Coleman said: “As part of our ongoing relationship with GE Renewable Energy, we selected their power storage system as it was flexible, scalable and allowed us to perform a range of tasks enabling us to provide resilient services, not only to the National Grid ESO, but to our private energy consumers within our expanding on-site Grid.”

GE Renewable Energy renewable hybrids CEO Prakash Chandra added: “The world is increasingly moving to generate more dispatchable renewables using Hybrid solutions – combining the power of standalone technologies like wind and solar with storage through controls and software, and, this project is a further demonstration of GE’s capabilities in this space.

“We are proud to have been selected by Wykes to deliver this flagship project in the UK and for the opportunity to deliver on this challenging solution.”

Energy Storage GE Solar
Share. Facebook LinkedIn Bluesky Twitter Reddit Email Copy Link
Previous ArticleLuminous offloads 162MW Oz solar
Next Article Sabella picked for SELKIE tidal demo

Related News

Envision and GES agree Europe clean energy pact

November 21, 2025

GES to build 695MW hybrid renewables park in Chile

September 2, 2025

Jaguar Land Rover turns used EV batteries into storage

August 22, 2023
Advertisement

Latest News

PODCAST: Is UK offshore wind back on track?

May 13, 2026

All-Energy 2026: Shanks bullish on UK clean power

May 13, 2026

GWEC, TÜREB launch wind partnership

May 13, 2026

ENERCON to build Türkiye blade plant

May 13, 2026
Advertisement

Advertisement

Company Profiles
  • Collett & Sons Ltd
  • Pembroke Port
  • Ørsted
  • Navantia Seanergies
    Navantia Seanergies
  • Natural Power
    Natural Power
  • LSP
    LSP Renewables
  • JDR Cable Systems Ltd
  • Full Circle Wind Services
  • Brightwind
    BrightWind Limited
  • Bilfinger UK
reNEWS
LinkedIn Facebook X (Twitter)
reMIX | Company Profiles | Industry Events
Get in touch | Advertising with us | About reNEWS

© 2026 Lewis Business Media. All Rights Reserved.
Lewis Business Media, Suite A, Arun House, Office Village, River Way, Uckfield, TN22 1SL

Terms and Conditions | Privacy Policy | Cookie Policy

Type above and press Enter to search. Press Esc to cancel.

Manage Consent
To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behaviour or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.
Functional Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
  • Manage options
  • Manage services
  • Manage {vendor_count} vendors
  • Read more about these purposes
View preferences
  • {title}
  • {title}
  • {title}