Close Menu
reNEWSreNEWS
  • Home
  • Offshore Wind
  • Onshore Wind
  • Solar
  • Other News
    • Energy Storage
    • Finance
    • Grid
    • People
    • reMIX
  • More
    • Company Profiles
    • Events
    • National Wind Energy Awards 2026
Latest News

PODCAST: Is UK offshore wind back on track?

All-Energy 2026: Shanks bullish on UK clean power

GWEC, TÜREB launch wind partnership

LinkedIn Facebook X (Twitter)
LinkedIn Facebook X (Twitter)
  • Email Briefings
  • About
  • Advertise
  • Contact
reNEWSreNEWS
  • Home
  • Offshore Wind

    PODCAST: Is UK offshore wind back on track?

    May 13, 2026

    UK offshore wind pipeline reaches 93GW

    May 13, 2026

    Seaway7 completes Hai Long cable works

    May 13, 2026

    DEME names new jack-up vessel

    May 13, 2026

    Mubadala invests $325m into Hornsea 3

    May 13, 2026
  • Onshore Wind

    ENERCON to build Türkiye blade plant

    May 13, 2026

    ‘Fatality at South Korean wind farm’

    May 13, 2026

    Scottish onshore wind forum launches

    May 12, 2026

    ENOVA starts 30MW Hiddels repowering

    May 12, 2026

    Iberdrola buys 40MW Italian wind farm

    May 12, 2026
  • Solar

    VSB secures Sicily PV project approval

    May 13, 2026

    Matrix connects two Spanish renewable projects

    May 13, 2026

    Qualitas targets €10bn energy investments

    May 12, 2026

    Consultation opens for 49.9MW Barrons Solar

    May 12, 2026

    Great North Road solar nears decision

    May 11, 2026
  • Other News
    • Energy Storage
    • Finance
    • Grid
    • People
    • reMIX
  • More
    • Company Profiles
    • Events
    • National Wind Energy Awards 2026
LinkedIn Facebook X (Twitter)
reNEWSreNEWS
Home » Uncategorized » Scots grant £1.4m to reduce wave power costs
Wave & Tidal

Scots grant £1.4m to reduce wave power costs

Eleanore RobinsonBy Eleanore RobinsonJuly 15, 20203 Mins Read
EU research programme makes marine call

Wave Energy Scotland (WES) has awarded a total of just under £1,400,000 to four projects aimed at bringing down the cost of wave power.

The projects will develop quick connection systems to improve the installation efficiency and infrastructure of wave power devices. 

Advertisement

Once completed, they should reduce the duration, cost and risk of offshore operation for wave energy convertors by supporting projects to design and develop quick connection and disconnection systems between devices and moorings and/or electrical systems.

Apollo’s PALM connector uses a passive locking mechanism that provides the connection and load transfer between the wave energy convertor (WEC) and its moorings.

This function is purely mechanical and requires only the input of a suitable deck winch on the installation vessel.

Blackfish Engineering Design’s C-DART provides a remote installation system for a WEC or other floating system. 

The novel system allows quick connection and disconnection of a WEC to an offshore buoy, providing both a mechanical mooring and electrical connection.

Nova Innovation’s MECmate is a wet-mate connection solution specifically designed for marine energy converters (MECs).  The project builds on their proven NovaCan technology currently in operation in Nova’s Shetland tidal array.

Quoceant’s Q-Connect is a set of modular subsystems that can be combined in different configurations to provide quick, safe, and low-cost connection for wave and tidal energy devices.

The system can cater for slack and taut moored devices on the surface or sub-sea.

WES managing director Tim Hurst said “This programme will develop technology that will reduce the cost of wave and tidal energy and ultimately help marine energy play a part in Scotland’s net-zero future. 

“Connecting and disconnecting devices quickly and remotely will increase safety in offshore operations, and the wider potential for these technologies is significant across offshore and subsea applications.”

Energy Minister Paul Wheelhouse added:”This announcement represents an important step forward for Scotland’s world-leading wave energy sector.

“We believe that wave energy offers tremendous economic potential and can play an important role in Scotland’s response to the global climate emergency.

“I am immensely proud of the progress being made under our Wave Energy Scotland programme, which is by far the largest of its kind in the world.  

“I congratulate all the successful teams under this funding call and look forward to seeing further progress from these projects in the months to come.”

From the seven Stage 1 projects, four projects have come through the WES Stage Gate process to secure Stage 2 contracts in the Quick Connection Systems programme.

The teams aim to develop their designs during the second stage of the programme, working with partners to test and model the technology prior to scale testing in the future.

This is the latest stage gate funding process in the WES programme, which is fully funded by the Scottish Government.

Scotland Wave and Tidal Wave Energy Scotland
Share. Facebook LinkedIn Bluesky Twitter Reddit Email Copy Link
Previous ArticleWood completes designs for Scottish hydrogen project
Next Article Siemens Gamesa secures 165MW Vietnamese double

Related News

‘Tidal, wave can deliver £8bn boost to Scotland’

February 10, 2025

Mocean unveils wave energy prototype for Orkney trials

April 21, 2021

Scots wave duo secure £1m WES boost

March 27, 2020
Advertisement

Latest News

PODCAST: Is UK offshore wind back on track?

May 13, 2026

All-Energy 2026: Shanks bullish on UK clean power

May 13, 2026

GWEC, TÜREB launch wind partnership

May 13, 2026

ENERCON to build Türkiye blade plant

May 13, 2026
Advertisement

Advertisement

Company Profiles
  • Collett & Sons Ltd
  • TGS
  • Ørsted
  • Navantia Seanergies
    Navantia Seanergies
  • LSP
    LSP Renewables
  • JDR Cable Systems Ltd
  • EEW
    EEW Special Pipe Constructions GmbH
  • EDF
    EDF
  • Brightwind
    BrightWind Limited
  • Bilfinger UK
reNEWS
LinkedIn Facebook X (Twitter)
reMIX | Company Profiles | Industry Events
Get in touch | Advertising with us | About reNEWS

© 2026 Lewis Business Media. All Rights Reserved.
Lewis Business Media, Suite A, Arun House, Office Village, River Way, Uckfield, TN22 1SL

Terms and Conditions | Privacy Policy | Cookie Policy

Type above and press Enter to search. Press Esc to cancel.

Manage Consent
To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behaviour or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.
Functional Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
  • Manage options
  • Manage services
  • Manage {vendor_count} vendors
  • Read more about these purposes
View preferences
  • {title}
  • {title}
  • {title}