Close Menu
reNEWSreNEWS
  • Home
  • Offshore Wind
  • Onshore Wind
  • Solar
  • Other News
    • Energy Storage
    • Finance
    • Grid
    • People
    • reMIX
  • More
    • Company Profiles
    • Events
    • National Wind Energy Awards 2026
Latest News

PODCAST: Is UK offshore wind back on track?

All-Energy 2026: Shanks bullish on UK clean power

GWEC, TÜREB launch wind partnership

LinkedIn Facebook X (Twitter)
LinkedIn Facebook X (Twitter)
  • Email Briefings
  • About
  • Advertise
  • Contact
reNEWSreNEWS
  • Home
  • Offshore Wind

    PODCAST: Is UK offshore wind back on track?

    May 13, 2026

    UK offshore wind pipeline reaches 93GW

    May 13, 2026

    Seaway7 completes Hai Long cable works

    May 13, 2026

    DEME names new jack-up vessel

    May 13, 2026

    Mubadala invests $325m into Hornsea 3

    May 13, 2026
  • Onshore Wind

    ENERCON to build Türkiye blade plant

    May 13, 2026

    ‘Fatality at South Korean wind farm’

    May 13, 2026

    Scottish onshore wind forum launches

    May 12, 2026

    ENOVA starts 30MW Hiddels repowering

    May 12, 2026

    Iberdrola buys 40MW Italian wind farm

    May 12, 2026
  • Solar

    VSB secures Sicily PV project approval

    May 13, 2026

    Matrix connects two Spanish renewable projects

    May 13, 2026

    Qualitas targets €10bn energy investments

    May 12, 2026

    Consultation opens for 49.9MW Barrons Solar

    May 12, 2026

    Great North Road solar nears decision

    May 11, 2026
  • Other News
    • Energy Storage
    • Finance
    • Grid
    • People
    • reMIX
  • More
    • Company Profiles
    • Events
    • National Wind Energy Awards 2026
LinkedIn Facebook X (Twitter)
reNEWSreNEWS
Home » Uncategorized » ‘Bottlenecks threaten offshore wind surge’
Offshore Wind

‘Bottlenecks threaten offshore wind surge’

Web EditorBy Web EditorAugust 28, 20252 Mins Read
ODE wins job at 384MW South Korean project

Europe’s offshore wind pipeline has reached 411GW across 386 projects but infrastructure bottlenecks threaten targets, according to a report by the Energy Industries Council.

The study found 84% of projects are still in planning or feasibility, with only five of Europe’s 80 specialist installation vessels capable of handling 14–15MW turbines.

Advertisement

Port upgrades take six to 10 years to complete, clashing with project schedules.

Europe currently has 37.8GW operating across 150 farms comprising 7178 turbines.

The UK leads with 15.6GW in operation, followed by Germany with 9GW and the Netherlands at 5.5GW.

Floating wind now accounts for 37% of the pipeline, particularly in the Mediterranean and southern Europe.

Germany faces pressure despite a 31.1GW development pipeline, with negative bidding seen as raising costs and slowing delivery.

France has advanced floating wind through 2024 auctions, while Norway awarded a CfD at €99.4/MW for the Sorlige Nordsjo II project.

The report said Europe must align financial investment decisions with port capacity and auctions to hit 2030 targets.

EIC market intelligence manager Sharanya Kumaramurthy said: “Europe has scale in the pipeline, but delivery hinges on ports, vessels, auctions and faster investment decisions. Where those align, capacity arrives. Where they don’t, targets slip.”

The report warned Chinese OEMs are outpacing Europe, with 82GW of annual manufacturing capacity compared with 20GW, and called for robust auction design to avoid repeating Europe’s solar experience.

EIC global head of external affairs Rebecca Groundwater said: “Policy must lock in a predictable run of work and enable supply-chain finance. Use non-price criteria well, accelerate port upgrades, and keep capital flowing through EIB and national tools.”

Auction bottleneck Energy Industries Council manufacturing capacity Ports project pipeline Vessels
Share. Facebook LinkedIn Bluesky Twitter Reddit Email Copy Link
Previous ArticleKelag starts work on 48MW Lavamund project
Next Article Nordex wins 46MW German order from Trianel

Related News

Scottish floater port awarded £55m

March 5, 2025

UK floaters ‘could create 97,000 jobs by 2050’

October 9, 2024

UK ports ‘need to transform’ for floating wind

March 15, 2023
Advertisement

Latest News

PODCAST: Is UK offshore wind back on track?

May 13, 2026

All-Energy 2026: Shanks bullish on UK clean power

May 13, 2026

GWEC, TÜREB launch wind partnership

May 13, 2026

ENERCON to build Türkiye blade plant

May 13, 2026
Advertisement

Advertisement

Company Profiles
  • Collett & Sons Ltd
  • Seaway7
    Seaway7
  • Qualsurv Marine Consulting
    Qualsurv Marine Consulting
  • Ørsted
  • Oceantic Network
  • LSP
    LSP Renewables
  • JDR Cable Systems Ltd
  • EEW
    EEW Special Pipe Constructions GmbH
  • EDF
    EDF
  • Brightwind
    BrightWind Limited
reNEWS
LinkedIn Facebook X (Twitter)
reMIX | Company Profiles | Industry Events
Get in touch | Advertising with us | About reNEWS

© 2026 Lewis Business Media. All Rights Reserved.
Lewis Business Media, Suite A, Arun House, Office Village, River Way, Uckfield, TN22 1SL

Terms and Conditions | Privacy Policy | Cookie Policy

Type above and press Enter to search. Press Esc to cancel.

Manage Consent
To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behaviour or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.
Functional Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
  • Manage options
  • Manage services
  • Manage {vendor_count} vendors
  • Read more about these purposes
View preferences
  • {title}
  • {title}
  • {title}