Iberdrola France has signed a PPA with AGRATI Group, which specialises in the production of fastening systems and mechanical components.
Starting in 2025, AGRATI will purchase all the electricity generated by the Florembeau wind farm, located in the commune of Créquy, in the Pas-de-Calais region.
This wind farm comprises 5 turbines with a total output of 10.25MW. An annual output of 21 GWh per year will be sold to AGRATI starting in 2025.
The annual output of the Florembeau wind farm in Créquy will supply renewable energy to AGRATI’s 3 production sites in Fourmies, Vieux Conde (Nord Pas-de-Calais) and Avressieux (Savoie).
On these industrial sites, which employ 570 people on a surface area of 84.000 m2 for the manufacture of fastening systems, the AGRATI company consumes 38GWh of electricity every year.
The production of the Florembeau wind farm will cover 53% of the site’s energy needs. The low-carbon electricity that will power the sites will reduce the Agrati’s current CO2 emissions in France by 33% per year starting in 2025.
Lorenzo Zaniboni, Europe chief operating officer of Agrati, said: “This agreement marks an important milestone in Agrati’s sustainability journey.
“By powering our French production sites with renewable energy, we are not only reducing CO2 emissions by 2.200 tons annually but also aligning our operations with our long-term commitment to environmental responsibility.
“At Agrati, we believe that investing in green energy and innovative solutions is essential to building a resilient and sustainable future for our industry.”


