Close Menu
reNEWSreNEWS
  • Home
  • Offshore Wind
  • Onshore Wind
  • Solar
  • Other News
    • Energy Storage
    • Finance
    • Grid
    • People
    • reMIX
  • More
    • Company Profiles
    • Events
    • National Wind Energy Awards 2026
Latest News

PODCAST: Is UK offshore wind back on track?

All-Energy 2026: Shanks bullish on UK clean power

GWEC, TÜREB launch wind partnership

LinkedIn Facebook X (Twitter)
LinkedIn Facebook X (Twitter)
  • Email Briefings
  • About
  • Advertise
  • Contact
reNEWSreNEWS
  • Home
  • Offshore Wind

    PODCAST: Is UK offshore wind back on track?

    May 13, 2026

    UK offshore wind pipeline reaches 93GW

    May 13, 2026

    Seaway7 completes Hai Long cable works

    May 13, 2026

    DEME names new jack-up vessel

    May 13, 2026

    Mubadala invests $325m into Hornsea 3

    May 13, 2026
  • Onshore Wind

    ENERCON to build Türkiye blade plant

    May 13, 2026

    ‘Fatality at South Korean wind farm’

    May 13, 2026

    Scottish onshore wind forum launches

    May 12, 2026

    ENOVA starts 30MW Hiddels repowering

    May 12, 2026

    Iberdrola buys 40MW Italian wind farm

    May 12, 2026
  • Solar

    VSB secures Sicily PV project approval

    May 13, 2026

    Matrix connects two Spanish renewable projects

    May 13, 2026

    Qualitas targets €10bn energy investments

    May 12, 2026

    Consultation opens for 49.9MW Barrons Solar

    May 12, 2026

    Great North Road solar nears decision

    May 11, 2026
  • Other News
    • Energy Storage
    • Finance
    • Grid
    • People
    • reMIX
  • More
    • Company Profiles
    • Events
    • National Wind Energy Awards 2026
LinkedIn Facebook X (Twitter)
reNEWSreNEWS
Home » Uncategorized » LM Wind secures certification blessing for Haliade-X blade
Offshore Wind

LM Wind secures certification blessing for Haliade-X blade

SaraBy SaraNovember 10, 20202 Mins Read
Smart blade repair drones move step closer to reality

LM Wind Power’s record-breaking 107 metre blade for GE Renewable Energy’s Haliade-X turbine has received its component certificate from TUV Nord.

The component certification hinged on the testing of two 107 metre blades produced at the LM factory in Cherbourg, France, the company said.

Advertisement

One blade completed its testing at the WTTC test facility in Boston, in the US in September.

The other underwent a full-scale test (including static test, fatigue test and post-fatigue test) at the Offshore Renewable Energy (ORE) Catapult’s facility in Blyth, UK.

The final pull of the post-fatigue test took place in mid-October and less than two weeks later, the blade Component Certificate was secured.

This was only possible because of the advanced documentation preparation and close coordination between WTTC, ORE Catapult, LM Wind Power, GE Renewable Energy and TUV Nord, LM said.

LM Wind Power engineering vice president Hanif Mashal said: “Validating a blade and composite structure with the size and complexity of the Haliade-X LM 107.0 P is a technological milestone never seen or tried before.

“We are proud of the team whose tenacity and perseverance were continuously challenged by the circumstances we had to operate in, such as during the pandemic.

“We not only validated our design hypothesis with successful completion of the test but also encountered unknown risks and challenges.”

ORE Catapult test and validation director Tony Quinn added: “The testing programme undertaken on the LM 107m blade has been the most intensive and rigorous that we have undertaken, applying extreme loads under laboratory conditions 50% greater than ever previously applied in a blade test.

“To achieve full certification of the longest blade in the world is a ground-breaking achievement and testament to an unparalleled programme of collaboration between LM, GE Renewable Energy and ORE Catapult under the most challenging of global circumstances.”

GE LM Wind Power Offshore Wind ORE Catapult
Share. Facebook LinkedIn Bluesky Twitter Reddit Email Copy Link
Previous ArticleLabour urges green economic recovery
Next Article Nordex swoops on 302MW Texas wind

Related News

R&D delivers wind turbine tester to US

June 26, 2023

Haliade-X starts spinning

November 7, 2019

Haliade-X blade arrives for OREC tests

August 15, 2019
Advertisement

Latest News

PODCAST: Is UK offshore wind back on track?

May 13, 2026

All-Energy 2026: Shanks bullish on UK clean power

May 13, 2026

GWEC, TÜREB launch wind partnership

May 13, 2026

ENERCON to build Türkiye blade plant

May 13, 2026
Advertisement

Advertisement

Company Profiles
  • Collett & Sons Ltd
  • TGS
  • Seaway7
    Seaway7
  • Qualsurv Marine Consulting
    Qualsurv Marine Consulting
  • Natural Power
    Natural Power
  • LSP
    LSP Renewables
  • JDR Cable Systems Ltd
  • Full Circle Wind Services
  • EEW
    EEW Special Pipe Constructions GmbH
  • Bilfinger UK
reNEWS
LinkedIn Facebook X (Twitter)
reMIX | Company Profiles | Industry Events
Get in touch | Advertising with us | About reNEWS

© 2026 Lewis Business Media. All Rights Reserved.
Lewis Business Media, Suite A, Arun House, Office Village, River Way, Uckfield, TN22 1SL

Terms and Conditions | Privacy Policy | Cookie Policy

Type above and press Enter to search. Press Esc to cancel.

Manage Consent
To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behaviour or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.
Functional Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
  • Manage options
  • Manage services
  • Manage {vendor_count} vendors
  • Read more about these purposes
View preferences
  • {title}
  • {title}
  • {title}