Author: Sara
Six Nordex turbines replace the 13 original machines, in operation since 2001
The equipment, in operation in the seaport of Esbjerg, can lift up to 250 tonnes
The energy storage system will be installed at a UK gas terminal
The 16.75 terawatt hours suplied from the German North Sea exceeded 2017’s amount by 5%
German manufacturer experiences ‘challenging’ year with Q4 surge lifting spirits
Campaign to clear debris on seabed to occur in 2019 and 2020
First floating turbine demo will be used for research under new owner
The upgraded ControlCentre is the largest of its kind in the UK, managing over 175 renewable energy assets
The 97MW wind farm, due online later this year, will sell its power to Google

